My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 189CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 4 | APPROACH/METHODOLOGY <br />project Documentation that are technically accurate, logical, and clear in meaning. A secondary purpose of this quality program is to promote effective communication among all the various members of the project team, including subconsultants. <br />Corradino will create a QP for all projects, adhere to the Client’s requirements as applicable, and provide adequate continuous Quality Assurance (QA) and Quality Control (QC) throughout the project. <br />Corradino will be responsible for the overall project quality assurance, with the following objectives: <br />• To create an awareness of quality within the organization and communicate the goals for quality to all personnel. • To ensure our services incorporate the highest level of quality. • To meet the requirements of applicable quality assurance regulations and standards. <br />• To define effective and efficient procedures for documenting that the quality goals are met. Deliver a product that is complete, accurate, and consistent with the scope and required criteria. <br />This Quality Plan applies to all members of the Corradino Team involved in this project. While team members may use additional procedures to monitor the quality of their deliverables, they must adhere to the requirements outlined in this Quality Plan throughout the project. Variations to non-essential elements of this Quality Plan (such as color coding established in the Quality Control Tracking Stamp) will be allowed, provided they are clearly identified. They can be easily confirmed to meet or exceed the quality control requirements of this Quality Plan. <br />Before submission to Sunny Isles Beach, all deliverables will undergo a QC review to ensure they meet the project’s scope and criteria. The QC process includes a standard color-coded check-and-back procedure, referred to as the “Standard Checking Procedure,” to document the thoroughness of QC. <br />| THE CORRADINO WORKLOAD AND AVAILABILITY <br />Corradino is committed to meeting the City of Sunny Isles Beach’s schedule and budget requirements for each task work order assignment under this on-call Professional Engineering Services contract. As you can see from the organizational chart we have provided, we offer extensive staffing support and depth for the City of Sunny Isles Beach’s Continuing Professional <br />Workload Availability - Corradino <br />Corra <br />dino Eric C Ciscar White Spataf <br />ora <br />Bolde <br />n <br />Solis- <br />Rios <br />Clevel <br />and <br />Varan <br />asi <br />Kalten <br />bach <br />Moju <br />mder <br />Charp <br />entier Coffin Leon Roule <br />au Ng Lopez Hamm <br />ons <br />Alvare <br />z Lyon Nunez <br />Wojci <br />echow <br />ski <br />Hermi <br />da Ross Rineh <br />art Pacini Silva <br />AVAILABILITY 60 75 70 70 70 60 70 60 70 60 70 70 70 70 70 70 70 70 70 70 70 70 70 70 60 70 70 <br />WORKLOAD 40 25 30 30 30 40 30 40 30 40 30 30 30 30 30 30 30 30 30 30 30 30 30 30 40 30 30 <br />0 <br />10 <br />20 <br />30 <br />40 <br />50 <br />60 <br />70 <br />80 <br />90 <br />100 <br />Workload Availability <br />WORKLOAD AVAILABILITY
The URL can be used to link to this page
Your browser does not support the video tag.