My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
V3 Architectural Group, Inc. Bid Document (12)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
V3 Architectural Group, Inc
>
V3 Architectural Group, Inc. Bid Document (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:26:52 PM
Creation date
8/31/2026 3:26:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | Architects <br />16 <br />V3’s experience includes focused interior improvements, public-facility renovations, new construction, and multidisciplinary <br />assignments requiring coordination of architectural, structural, civil, landscape, mechanical, electrical, plumbing, fire- <br />protection, surveying, and geotechnical services. <br />Structural Engineering – HBC Engineering Company <br />HBC is available to provide: <br />• Structural inspections <br />• Existing-condition assessments <br />• Structural-integrity evaluations <br />• Existing-building analysis <br />• Building recertification-related evaluations <br />• Structural analysis and design <br />• Design of new structural systems and elements <br />• Foundation analysis and design <br />• Structural repair design <br />• Rehabilitation and strengthening <br />• Evaluation of deterioration and distress <br />• Retaining-wall and sheet-pile-wall design <br />• Replacement and construction phasing <br />• Conventional and advanced strengthening systems <br />• Nondestructive testing coordination <br />• Specialty structural analysis <br />• Structural calculations <br />• Signed and sealed structural drawings <br />• Structural technical specifications <br />• Structural QA/QC <br />• Review of structural RFIs and submittals <br />• Construction-phase observations and technical support <br />HBC’s structural resources allow the team to respond to both new-design assignments and projects involving existing- <br />building evaluation, repair, rehabilitation, strengthening, or phased replacement. <br />Mechanical, HVAC and Plumbing Engineering – TLC Engineering Solutions <br />TLC is available to provide: <br />• Existing Mechanical/HVAC/Plumbing system <br />assessments <br />• HVAC system analysis and design <br />• Heating and cooling load calculations <br />• Air-distribution evaluation and design <br />• Ventilation and indoor-air-quality improvements <br />• Mechanical equipment evaluation and replacement <br />• Mechanical-room modifications <br />• Plumbing-system evaluation and design <br />• Domestic-water and sanitary-system modifications <br />• Restroom-related plumbing improvements <br />• Equipment scheduling and selection <br />• Controls and building-automation coordination <br />• Energy-efficiency recommendations <br />• Life-cycle and operational-performance considerations <br />• Mechanical and plumbing calculations <br />• Working drawings and technical specifications <br />• Permitting support <br />• Review of mechanical and plumbing submittals and <br />RFIs <br />• Construction-phase observations and technical support <br />• Coordination with architectural and structural systems <br />TLC’s building-systems expertise will allow the team to assist the City with both limited system evaluations and <br />comprehensive modernization or replacement projects. <br />Construction Documents, Permitting and Agency Coordination <br />The V3 Team is available to provide: <br />• Design Development documents <br />• Permit-ready architectural and engineering drawings <br />• Technical specifications <br />• Discipline schedules and details <br />• Code and life-safety information <br />• Interdisciplinary coordination <br />• Constructability review <br />• QA/QC reviews <br />• Cost-estimate coordination <br />• 30%, 60%, 90%, and 100% milestone submissions, as <br />required by the task order <br />• Coordination of signed and sealed discipline <br />documents <br />• Permit applications and supporting documentation
The URL can be used to link to this page
Your browser does not support the video tag.