My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
V3 Architectural Group, Inc. Bid Document (12)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
V3 Architectural Group, Inc
>
V3 Architectural Group, Inc. Bid Document (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:26:52 PM
Creation date
8/31/2026 3:26:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | Architects <br />29 <br />Architectural & Engineering Services <br /> »Field verification of the existing 17th-floor <br />project area <br /> »Architectural design and preparation of <br />permit documents <br /> »Mechanical engineering <br /> »Electrical engineering <br /> »Plumbing engineering <br /> »Conceptual fire-sprinkler design <br /> »Coordination with Client-engaged specialty <br />consultants <br /> »Assistance addressing applicable County, <br />State, and Federal agency comments <br /> »Coordination of architectural and <br />engineering documents <br /> »Construction Administration, including <br />weekly OAC meetings, monthly site visits, <br />shop-drawing review, and RFI responses <br />Schematic Design Phase <br />V3 prepared Schematic Design drawings establishing the scale, quality, organization, and functional <br />arrangement of the proposed tenant improvement. The design was submitted to the Client for review <br />and approval before proceeding into subsequent phases. <br />Design Development Phase <br />V3 advanced the approved design into coordinated Design Development documents defining the proposed <br />layout, office configurations, modular systems, and associated mechanical, electrical, plumbing, and <br />fire-protection requirements. The Design Development package was prepared to confirm the project <br />scope and coordination requirements before initiation of the Contract Documents phase. <br />Contract Documents and Permitting <br />V3 is preparing detailed architectural and engineering Contract Documents describing the work <br />required to achieve building-permit approval. The coordinated documents address the architectural <br />layout, building-system modifications, modular office installations, and applicable agency requirements. <br />V3 will coordinate responses and revisions associated with County, State, and Federal agency comments <br />pertinent to the authorized scope <br />Construction Administration <br />V3’s Construction Administration responsibilities include weekly OAC participation, one site visit per <br />month, review of contractor shop drawings, responses to Requests for Information, and preparation of <br />supplemental design clarification when appropriate. <br />MINIMUM QUALIFICATION REQUIREMENTS MQR # 2MIAMI-DADE COUNTY11
The URL can be used to link to this page
Your browser does not support the video tag.