My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction, Inc. & West Architecture + DeBid Document (22)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
West Construction, Inc. & West Architecture + Design, LLC
>
West Construction, Inc. & West Architecture + DeBid Document (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:30:58 PM
Creation date
8/31/2026 3:29:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />4. APPROAH / METHODOLOGY <br />West Architecture + Design, LLC <br />820 North 4th Street, Lantana, Florida 33462 <br />Phone: 561-588-2027 / Fax: 561-582-9419 <br />Architecture License: AR93859 / AA26001503 <br />www.west-arch.com <br />Anticipated design and construction budget <br />Required milestones and completion dates <br />Permitting and approval requirements <br />Funding or grant-related requirements <br />Required meetings, presentations, and public involvement <br />Construction phasing or continuity-of-operations concerns <br />Specific deliverables and document formats <br /> <br />WAD will then prepare a task-order work plan identifying the proposed scope, team mem- <br />bers, responsibilities, schedule, deliverables, and fee. No work will begin until WAD receives <br />the City’s written authorization or Notice to Proceed. <br />Task-Order Organization <br /> <br />The WAD project manager will remain the City’s primary contact and will be responsible for <br />consolidating the team’s work into a complete and coordinated deliverable. <br /> <br />4.3 PROJECT DELIVERY WORK PLAN <br /> <br />WAD will tailor the following process to the scope of each task order. <br /> <br />Phase 1: Study, Programming, & Existing Conditions <br />WAD will begin by confirming the City’s goals, operational needs, budget, schedule, and per- <br />formance expectations. The team will review available drawings, reports, surveys, mainte- <br />nance records, and other background information. <br /> <br />Activities may include: <br />Site and facility observations <br />Existing-condition documentation <br />Stakeholder interviews and programming meetings <br />Code and zoning research <br />Building-system evaluations <br />Survey and geotechnical coordination <br />Responsibility Lead <br />Contract administration and City coordination WAD <br />Architectural design and programming WAD <br />Cost, constructability, and schedule <br />coordination WAD <br />Mechanical, electrical, plumbing, fire <br />protection, and structural engineering TLC <br />Civil engineering, landscape architecture, <br />surveying, and mapping KEITH <br />Geotechnical investigations and <br />recommendations Nutting <br />Interdisciplinary QA/QC WAD and discipline leads <br />58
The URL can be used to link to this page
Your browser does not support the video tag.