My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction, Inc. & West Architecture + DeBid Document (22)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
West Construction, Inc. & West Architecture + Design, LLC
>
West Construction, Inc. & West Architecture + DeBid Document (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:30:58 PM
Creation date
8/31/2026 3:29:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />4. APPROAH / METHODOLOGY <br />West Architecture + Design, LLC <br />820 North 4th Street, Lantana, Florida 33462 <br />Phone: 561-588-2027 / Fax: 561-582-9419 <br />Architecture License: AR93859 / AA26001503 <br />www.west-arch.com <br />Contractor payment applications will be <br />compared with: <br /> <br />Verified field progress <br />Approved schedule of values <br />Stored-material documentation <br />Approved change orders <br />Previous payments <br />Remaining contract balance <br />Proposed change orders will be <br />evaluated for: <br /> <br />Contractual entitlement <br />Scope validity <br />Quantity and pricing support <br />Labor and material costs <br />Schedule consequences <br />Potential alternatives <br />Effect on project contingency <br /> <br />At each milestone, WAD will compare the estimate with the approved budget and previous <br />estimate. Significant changes will be identified and explained to the City. <br /> <br />If the projected cost exceeds the established budget, WAD will not wait until bidding to ad- <br />dress the issue. The team will evaluate: <br /> <br />Scope priorities <br />Material and system alternatives <br />Constructability <br />Phasing opportunities <br />Life-cycle cost <br />Energy and maintenance requirements <br />Bid alternates <br />Available contingencies <br /> <br />Recommendations will be presented to the City in a clear decision format identifying the esti- <br />mated cost effect, operational effect, schedule effect, and advantages or disadvantages of <br />each option. <br /> <br />4.6 CONSTRUCTION-PHASE COST CONTROL <br /> <br />During construction, WAD will assist the City in monitoring payments, proposed changes, al- <br />lowances, and remaining contingency. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />WAD will provide the City with a written recommendation before approval. A change-order <br />log will be maintained so the City can readily understand the status and cumulative financial <br />effect of proposed and approved changes. <br /> <br />4.7 VALUE ENGINEERING <br /> <br />WAD views value engineering as the structured evaluation of cost, function, durability, con- <br />structability, operations, and long-term performance—not simply the reduction of project <br />60% Construction Documents Quantity and scope verification <br />90% Construction Documents Bid-readiness and scope-to-budget reconciliation <br />Final Documents Final pre-bid estimate and alternates review <br />Bidding Comparison of bids with the final estimate <br />Construction Change-order and contingency tracking <br />Milestone Cost-Control Activity <br />62
The URL can be used to link to this page
Your browser does not support the video tag.