Laserfiche WebLink
HBC Engineering Company | 122 <br />David Coker, EI <br />MOT <br />David specializes in roadway and traffic engineering, with expertise in <br />3D roadway design, traffic operations analysis, and signalization. He has <br />worked on highways, arterial roads, and transit projects, utilizing Bentley <br />OpenRoads Designer for advanced modeling and ensuring compliance with <br />FDOT standards. His background includes horizontal geometry, drainage <br />design, ADA compliance, Temporary Traffic Control (TTC), and traffic safety <br />studies, along with extensive experience in traffic impact analysis, signal <br />retiming, and simulation modeling using Synchro and Vissim. David has <br />contributed to major projects, including the NW 84th Ave Reconstruction, <br />S.R. 817 Widening, and Miami-Dade Strategic Miami Area Rapid Transit <br />(SMART) Plan Bus Express rapid Transit (BERT), where he conducted <br />traffic control analysis, microsimulations, and Transit Signal Priority (TSP) <br />optimization. David is certified in Advanced MOT and as an IMSA Traffic <br />Signal Technician, and is also a licensed drone pilot. David integrates <br />innovative technology and data-driven solutions to enhance roadway safety, <br />optimize traffic flow, and improve transportation infrastructure. <br />MDC-DTPW, NW 84th Ave Reconstruction from NW 58th St to NW 74th <br />St Design-Build. <br />Lead Project Engineer Intern responsible for the development of roadway and <br />drainage engineering plans for this project, which involves the reconstruction <br />of 1 mile of an existing two-lane roadway to expand it into a 4-lane roadway <br />with Two-Way Left-Turn Lane (TWLTL), where Right-of-Way is available. The <br />overall design effort includes the design of new closed drainage conveyance <br />systems, connection to existing outfall and stormwater retention facilities, <br />replacement of existing Corrugated Metal Pipe (CMP) culverts with Reinforced <br />Concrete Pipe (RCP) culvert crossings, and designing a new stormwater <br />management facility to compensate for the additional impervious areas. <br />Location: Miami-Dade County, FL. Dates: 2022–Ongoing. Contract No.: DB21- <br />DTPW-04. HBC Fee: $7M. Reference: Alejandro Sauleda, (305) 375-4866, <br />alejandro.sauleda@miamidade.gov. <br />MDC-DTPW, Northeast Corridor Federal Transit Administration (FTA) <br />Categorical Exclusion Data Collection. <br />David assisted with all data collection tasks for this project, which involved <br />evaluating the impacts of implementing 13.5 miles of new commuter rail <br />service. He was responsible for overseeing and preparing traffic data <br />collection and performing safety analysis over an initial four-month period, <br />with supplemental intersections added later, for 76 study intersections. This <br />project includes Turning Movement Counts (TMCs), 292 72-hour approach <br />volume counts, traffic signal pre-emption, geometric data, field review of <br />existing conditions, queuing data, Spot Speed studies at 36 locations, and <br />safety analysis for 52 state road intersections. <br />Location: Miami-Dade County, FL. Dates: 2022–Ongoing. Reference: Morteza <br />Alian, Morteza.Alian@parsons.com, 305-507-3843 <br />8 Years of <br />Experience <br />Years with HBC <br />5 years <br />Education <br />B.S. in Civil Engineering, <br />Florida International <br />University (12/08/2018) <br />Registration(s) <br />EI (FL) No. 1100023530 <br />(6/26/2020) <br />Licenses & Certifications <br />TTC Advanced #57886 <br />Certified Drone Pilot <br />Bentley OpenRoads 3D <br />Modeling <br />Synchro and Vissim <br />Simulations <br />Expertise <br />Roadway design, traffic <br />engineering, traffic safety <br />studies, signalization, <br />Maintenance of Traffic <br />(MOT), temporary traffic <br />control, traffic simulation, <br />data collection, drainage <br />design .