My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 134 <br />rigorous traceability and compliance across all project phases. <br />Location: Doral, FL. Dates: 10/2020-10/2021. <br />University of Miami, Administrative and Hazardous Materials Compliance, Radiation Control Department <br />Tamara provided administrative, technical, and compliance support in a highly regulated university and medical <br />environment, ensuring adherence to federal, state, and institutional Environmental Health & Safety requirements. <br />She organized and verified compliance records related to hazardous materials, required training, and personnel <br />exposure, maintaining audit-ready files to support inspections and compliance reviews using BioRAFT, SharePoint, <br />and Microsoft Office. She coordinated and tracked mandatory safety training, supported facility renovations <br />through site inspections and contractor coordination, and prepared correspondence and documentation for <br />internal leadership and regulatory agencies. <br />Location: Miami, FL. Dates: 2023-2026. <br />* Architectural Construction Project Management, Especial Engineering Services <br />As Architectural Designer and Project Manager, Tamara directed construction projects from planning through <br />closeout with a strong focus on safety compliance, inspections, and on-site supervision to ensure adherence <br />to applicable codes and project requirements. She managed budgets, schedules, workforce and subcontractor <br />coordination, and day-to-day field activities while maintaining accurate technical documentation, permits, and <br />project records. She conducted routine site walks, quality checks, and compliance verifications to identify risks <br />early and keep work progressing efficiently. <br />Location: Havana, Cuba. Dates: 04/2017-08/2020.* Prior to HBC <br />Tamara Toledo Alonso
The URL can be used to link to this page
Your browser does not support the video tag.