Laserfiche WebLink
HBC Engineering Company | 140 <br />pavement markings, upgraded drainage to manage stormwater runoff, and <br />landscaping to beautify the area. These improvements aim to enhance <br />connectivity and accessibility for pedestrians and cyclists and to promote <br />active lifestyles among residents. Max is supporting general inspection <br />activities by maintaining daily reports, documenting field conditions through <br />photographs, assisting with testing requirements, tracking quantities for <br />progress estimates. <br />Location: Village of Palmetto Bay, FL. Date: 05/2025-09/2025. Reference: <br />Daniela Fernandez, (305) 905-6268, daniela.fernandez2@miamidade.gov\ <br />Palm Beach County (PBC), Roadway, Sidewalk, and Pedestrian Lighting Improvements on Cherry Rd <br />from N Military Trail to Quail Dr LAP Project. <br />This project involves the construction of an 8’ wide sidewalk along the north side of Cherry Road, stretching from <br />N. Military Trail to a point 120’ west of Quail Drive. Additionally, a 6’ wide sidewalk will be constructed on the <br />south side of Cherry Road, covering the same stretch from N. Military Trail to Quail Drive, with the exception of <br />the segment that crosses Bridge No. 934229. The scope also includes Milling and Resurfacing (M&R), widening, <br />and the installation of appropriate Signing and Pavement Markings (S&PMs) to better accommodate current <br />traffic volumes and improve overall traffic flow. Pedestrian-scale lighting and landscaping will be installed <br />along the sidewalks and in key areas of the roadway. As Construction Engineering and Inspection (CEI) Senior <br />Inspector, Max was responsible for maintaining accurate daily reports, verifying quantities and work compliance, <br />documenting changes in field conditions, supporting the interpretation of plans and specifications, and <br />providing input on potential resolutions for construction issues. <br />Location: Palm Beach County, FL. Dates: 03/2025 - Ongoing. PBC Project No.: 2021025. Construction Fees: $1.2M. <br />Reference: Dave West, (561) 684-4180, DWest1@pbc.gov. <br />*Virilla Bridge Rehabilitation Project. <br />Quality Control Manager for the Virilla Bridge Rehabilitation Project on Route 32 under UNOPS supervision. Max <br />implemented quality procedures, conducted inspections, coordinated materials testing, ensured compliance <br />with project specifications, monitored subcontractor performance, managed quality documentation, and <br />resolved non-conformities in collaboration with field teams to support timely and cost-effective delivery. <br />Location: Costa Rica. Dates: 04/2023 – 10/2024. <br />*Chorrera de las Playas. <br />Quality Control Coordinator for the startup and quality compliance of the “Chorrera de las Playas” Project in <br />Panama. Max implemented the Quality Control Plan, coordinated permitting with regulatory agencies, supported <br />resource mobilization, monitored subcontractor compliance, managed quality documentation, and worked with <br />field teams to address deficiencies and maintain schedule and budget alignment. <br />Location: Panama. Dates: 10/2022-03/2023. <br />Max Fernandez, EI <br />Expertise <br />Bridge inspection, quality <br />control management, <br />roadway and utility <br />inspection, asphalt and <br />concrete testing, drainage <br />and earthwork inspection