Laserfiche WebLink
HBC Engineering Company | 149 <br />Florida Department of Transportation (FDOT) District 4, SR-820/Pines Blvd from the I-75 North On-Ramp to <br />East of NW 118th Ave <br />Maikel leads the lighting design and post-design services for this in-house design project along SR-820/Pines <br />Boulevard. The scope includes pedestrian lighting on a 10-foot wide sidewalk and five intersection lighting retrofits, <br />including FPL luminaires. <br />Location: Broward County, FL. Dates: 2021-Ongoing. Reference: Karl M. Kennedy, PE, CFM, (954) 518-9040, <br />KKennedy@ppines.com. <br />Florida Department of Transportation (FDOT) District 4, Intersection Lighting Retrofit Improvements <br />Project <br />Maikel oversees lighting retrofit improvements for 29 signalized intersections, retrofitting existing light poles with <br />LED luminaires to replace outdated HPS luminaires and adding new light poles with LED and FPL luminaires at <br />strategic locations to meet roadway and pedestrian lighting standards. He also oversees the Temporary Traffic <br />Control Plans, roadway design, surveying, and interdisciplinary and interagency coordination. <br />Location: Palm Beach County, FL. Dates: 6/2021-Ongoing. Reference: Ronald P. Wallace, PE, (954) 646-1197, Ronald. <br />Wallace@dot.state.fl.us. <br />Palm Beach County (PBC), SR-804/Boynton Beach Blvd from SR-7 to Florida's Turnpike <br />Maikel directed the plans production, conducting two independent photometric analyses along the corridor <br />in collaboration with PBC and FDOT to verify the scope of the Surtax Street Lighting Conversion Project. Work <br />included establishing base existing illumination levels for HPS luminaires on shared and dedicated FPL poles and <br />evaluating four existing signalized intersections within the project limits. <br />Location: Boynton Beach, FL. Dates: 2021-2023. Reference: May Cheng, PE, (561) 684-4030, mcheng@pbcgov.org. <br />Florida Department of Transportation (FDOT) District 6, Districtwide Resurfacing Scoping Reports, Work <br />Program Development Support <br />As Electrical Engineer, Maikel documents the existence and type of lighting within the project limits, assesses <br />existing lighting system conditions, researches existing information and as-built plans, and identifies lighting <br />issues across 28 Task Work Orders. He performs photometric readings and photometric analyses of existing and <br />proposed conditions at specific locations and develops the concept lighting layout for inclusion in the Pavement <br />Restoration Assessment Reports. <br />Location: Miami-Dade County, FL. Dates: 3/2020-Ongoing. Reference: Calvin Mason, PE, (305) 470-5386, Calvin. <br />Mason@dot.state.fl.us. <br />Miami-Dade County Department of Transportation and Public Works (MDC-DTPW), NE 2nd Ave <br />Reconstruction from NE 20th St to NE 36th St Design-Build <br />Maikel leads the electrical plans production for the reconstruction and expansion of a 1.09-mile segment of an <br />existing 2-lane roadway to a 2-lane roadway with a Two-Way Left-Turn Lane and 6-foot buffered bike lanes in each <br />direction. He coordinates the electrical and lighting scope with the multidisciplinary design-build team to support <br />the complete streets configuration. <br />Location: Miami, FL. Dates: 7/2022-Ongoing. Reference: Alejandro Sauleda, (305) 375-4866, alejandro.sauleda@ <br />miamidade.gov. <br />Maikel Fiallo Nunez, PE