Laserfiche WebLink
HBC Engineering Company | 150 <br />Javier Gil, EE <br />Electrical Engineer <br />Javier is an experienced Electrical Engineer and problem-solver with programming <br />skills and a hard-working mentality. He is a dynamic communicator, who consistently <br />outperforms company goals and expectations. Javier is skilled in AC/DC motor drives, <br />high voltage cabling, and preliminary electrical design. He is intimately familiar with <br />control and power-delivery systems. Javier is an innovative Electrical Engineer that <br />focuses on developing new healthcare methods and technologies. He is also an <br />AutoCAD draftsman with a strong understanding of design and drafting principles. <br />Seminole Tribe of Florida (STOF), Brighton Indian Reservation <br />Wastewater Treatment Plant Expansion. <br />Electrical Engineer for supporting the expansion and modernization of the STOFI <br />Brighton Indian Reservation Wastewater Treatment Plant, a 20.3 acre facility <br />in Glades County that replaced outdated wastewater treatment facilities with <br />advanced infrastructure, new buildings, roadways, and an upgraded wastewater <br />pump station to meet growing community needs.Electrical engineering services <br />supported the wastewater pump station and treatment facility improvements <br />through coordination of electrical power, equipment connections, controls, and <br />facility systems necessary for safe, efficient, and dependable plant operation. The <br />expansion enhanced the capacity and functionality of the wastewater treatment <br />facility while integrating modern technologies and sustainable practices. <br />Location: Okeechobee, FL. Dates: 2020-2022. Reference: Ben Luke, ben.luke@ <br />greshamsmith.com <br />Miami-Dade WASD, Ocean Outfall Legislation Projects Wastewater <br />Treatment Plant Effluent Energy Recovery System (EERS) and <br />Renewable Energy. <br />Electrical Engineer supporting the Central (CDWWTP) and South (SDWWTP) EERS <br />and Renewable Energy Program for Miami-Dade Water and Sewer Department. <br />Primary responsibilities include performing quantity takeoffs and supporting cost <br />estimates based on multi-phase design documents (conceptual, 60%, 90%, and <br />final), as well as conducting electrical design review and coordination to ensure <br />accurate scope definition. Work involves reviewing plans and specifications <br />to develop material quantities, validating design consistency for estimating <br />purposes, and coordinating with civil, mechanical, and controls teams. The <br />project includes a new EERS building, renewable energy systems, and associated <br />electrical, instrumentation, and control infrastructure, including major equipment <br />such as pumps, heat exchangers, fire pump systems, electrical rooms, and a <br />ground-mounted photovoltaic system. Responsibilities also include supporting <br />constructability reviews, permits, documenting quantity assumptions, and <br />aligning estimates with WASD standards and project requirements. <br />Location: Miami-Dade County, FL. Dates: 2025-Ongoing. Contract No.: <br />S-20441. <br />7 Years of <br />Experience <br />Years with HBC <br />3 years <br />Education <br />B.S. in Electrical <br />Engineering, Universidad <br />Technologica de La Habana <br />(07/20/2019) <br />Licenses & Certifications <br />Wiring Schematics <br />System-Level Electrical <br />Design and Integration <br />Skilled with Analytical <br />Software <br />Extensive AutoCAD <br />Knowledge <br />Staff Management <br />Power Systems <br />Electrical Engineering <br />2D and 3D Modeling <br />DIALUX Knowledge <br />Team Management <br />Employee Scheduling <br />TTC Advanced # 620312 <br />Expertise <br />Electrical engineering, <br />power systems design, <br />roadway lighting, signalized <br />intersection lighting, <br />AutoCAD drafting, <br />photometric analysis, and