My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 24 <br />Basin H1 Stormwater Improvements Project <br />City of Belle Glade <br />This project involves the implementation of the City of Belle Glade’s <br />Stormwater Master Plan for Basin H1. Funded through the Florida <br />Department of Commerce’s Community Development Block Grant (CDBG) <br />Mitigation (MIT) program, HBC played a key role in supporting the City <br />by preparing and submitting all required forms and reports to ensure <br />the timely reimbursement of funds. <br />Basin H is the largest drainage basin identified in the Stormwater Master <br />Plan, and HBC was responsible for the Hydrologic and Hydraulic (H&H) <br />design and analysis of Basin H1, which encompasses approximately 48 <br />acres. The Interconnected Channel and Pond Routing (ICPR) model was <br />utilized to evaluate proposed conditions and to incorporate additional <br />upstream flow contributions, in accordance with the adopted Stormwater <br />Master Plan. <br />HBC was selected to provide engineering services to: <br />• Address ponding issues and flooding near City Hall and reduce flood <br />risks <br />• Efficiently capture and filter pollutants from stormwater runoff <br />• Ensure safe and reliable infrastructure, and create a safer environment <br />• Install a hydrodynamic stormwater treatment device to address the <br />water quality of the stormwater runoff <br />Location <br />Belle Glade, FL <br />Dates <br />2023 - Ongoing <br />Budget <br />HBC Fee: $343K <br />Construction Cost: $5.3M <br />Reference <br />Keith R. Schriner <br />(954) 436-7000 <br />kschriner@millerlegg.com <br />Contract No. <br />07-2023 <br />Scope of Services <br />Stormwater design, <br />Hydrologic and Hydraulic <br />(H&H) analysis, ICPR <br />modeling, flood mitigation, <br />water quality treatment, <br />drainage pipe installation, <br />drainage structures, outfall <br />design, pollutant filtering, <br />and reimbursement <br />support.
The URL can be used to link to this page
Your browser does not support the video tag.