Laserfiche WebLink
HBC Engineering Company | 25 <br />• Provide stubouts for future upstream system and City Hall <br />improvements, in accordance with the Stormwater Master Plan <br />• Develop systemwide stormwater improvement layout to address flood <br />risks <br />• Install approximately 7,300 LF of new drainage pipes <br />• Install approximately 65 new drainage structures <br />• Add a downstream defender and one outfall to Canal 1 <br />• Provide a positive outfall to the South Florida Conservancy District <br />Canal 1