My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 27 <br />SR 29 from North of Wagon Wheel Rd to South of <br />I-75 <br />FDOT District One <br />FDOT District One advanced this pavement only project along approximately 4.2 miles <br />of SR-29 from north of Wagon Wheel Road to south of I-75 in Collier County. HBC served <br />as the prime consultant, with Hernan Lugo serving as Project Manager and Roadway <br />EOR for the milling and resurfacing and signing and pavement markings improvements. <br />HBC’s major work included milling and resurfacing of the rural two lane roadway, <br />mainline pavement, paved shoulders, asphalt driveway connections, updated signing <br />and pavement markings, ground in rumble striping, object marker replacement, guardrail <br />evaluation and replacement, damaged shoulder gutter review, utility coordination, <br />SUE at guardrail and multi post sign locations, drainage review, erosion control, and <br />environmental permitting coordination. The corridor is located within a natural context <br />area and primary Florida panther zone, requiring careful consideration of wildlife crossing <br />features, panther warning signs, wetland conditions, floodplain storage, and coordination <br />with environmental agencies. Bridge 030299 over a wildlife crossing was excluded from <br />milling and resurfacing but required structural and functional adequacy review, with <br />permanent tape markings proposed on the concrete bridge surface. The Long Range <br />Estimate identified a total project cost of approximately $4.32 million. <br />Location <br />Collier County, FL <br />Dates <br />2022 <br />Budget <br />HBC Fee: $1M <br />Reference <br />Amber Albritton <br />(863) 519-2668 <br />Key Components <br />Paving and Drainage Engineering <br />Alignment, Structural <br />Assessment Experience, <br />Permitting and Regulatory <br />Coordination, Cost Estimating <br />and Scope Development
The URL can be used to link to this page
Your browser does not support the video tag.