My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 30 <br />Design Build Services for the Central District <br />Wastewater Treatment Plant (CDWWTP) Oxygen <br />Production Facility <br />Miami-Dade Water & Sewer Department <br />As part of Miami-Dade County’s infrastructure modernization efforts, HBC <br />played a key role in the design-build project for the new Oxygen Production <br />Facility at the Central District Wastewater Treatment Plant (CDWWTP). This <br />facility was designed to replace aging oxygen production systems with state- <br />of-the-art Vacuum Pressure Swing Adsorption (VPSA) technology, ensuring <br />reliable and continuous oxygen production to support wastewater treatment <br />operations. The project enhanced environmental compliance and supported <br />sustainable growth for the region while meeting stringent EPA Consent <br />Decree requirements. <br />HBC was responsible for the civil engineering design, construction <br />management, project control, scheduling, and coordination across multiple <br />disciplines, ensuring seamless project execution. <br />Key elements included: <br />• Site Development & Civil Engineering – Designed and executed site <br />layout, clearing and grubbing, pavement design, and civil/site dimension <br />control. <br />• Drainage & Stormwater Management – Developed a swale and <br />exfiltration trench system to mitigate stormwater runoff and ensure <br />Location <br />Miami, FL <br />Dates <br />03/2019 - 06/2022 <br />Budget <br />HBC Fee: $150K <br />Construction Cost: $58M <br />Reference <br />Warren Howard <br />(954) 300-6479 <br />warren.howard <br />@aecom.com <br />Key Components <br />Site development, <br />drainage and stormwater <br />management, structural <br />coordination, electrical and <br />mechanical coordination, <br />construction engineering, <br />project scheduling and <br />compliance. <br />2021 Project of the Year Category III <br />Cuban American Association of Civil Engineers
The URL can be used to link to this page
Your browser does not support the video tag.