My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 31 <br />compliance with water quality and quantity regulations. <br />• Structural, Electrical, and Mechanical Coordination – Ensured the <br />adequacy of designs across multiple disciplines, including structural, <br />process mechanical, electrical, instrumentation, plumbing, HVAC, and <br />fire protection. <br />• Construction Engineering & Documentation – Oversaw contractor <br />payment validation, processed Requests for Information (RFIs), <br />managed submittals, and ensured regulatory compliance. <br />• Project Scheduling & Compliance – Closely monitored the construction <br />schedule to meet EPA deadlines, leveraging HBC’s expertise in Proliance <br />Project Management Software to track progress and ensure timely <br />completion. <br />This project significantly improved operational efficiency at the CDWWTP, <br />replacing outdated oxygen production units with a modern, sustainable <br />system. By ensuring redundant oxygen production, the facility now operates <br />with increased reliability while reducing energy consumption. HBC’s <br />expertise in multi-disciplinary project coordination and environmental <br />compliance was instrumental in delivering this essential infrastructure <br />upgrade on schedule and within budget. <br />2021 Project <br />of the Year <br />Category III <br />Cuban American <br />Association of Civil <br />Engineers
The URL can be used to link to this page
Your browser does not support the video tag.