Laserfiche WebLink
HBC Engineering Company | 72 <br />Hernan Lugo, MS, PE, CFM <br />Deputy Project Manager & Drainage <br />Hernan specializes in drainage design, stormwater management, roadway <br />design, and construction administration, with extensive experience in <br />transportation infrastructure projects. He has led and managed projects for <br />FDOT, Miami-Dade County, and other public agencies, overseeing drainage <br />analysis, floodplain management, utility coordination, and permitting. His <br />expertise includes developing stormwater solutions, conducting Hydrologic <br />and Hydraulic modeling, and ensuring regulatory compliance with FDOT, <br />FDEP, SFWMD, and local municipalities. A licensed Professional Engineer <br />in Florida and Texas, he is also a Certified Floodplain Manager and a Florida <br />Certified Building Contractor. Hernan is committed to delivering resilient and <br />efficient infrastructure through innovative, cost-effective solutions. <br />FDOT District 4, S.R. 7/U.S. 441 Transit Corridor Improvements LAP <br />Project <br />Hernan serves as Drainage Engineer leading stormwater design and <br />connectivity enhancements to improve multimodal access and pedestrian <br />and bicycle safety along S.R. 7/U.S. 441. He designs effective drainage systems <br />with culvert crossings, flumes, and curb inlets, and coordinates stormwater <br />management for new Shared-Use Paths and sidewalks. His scope supports <br />ADA-compliant curb ramps, pedestrian signalization, pedestrian lighting <br />at high-emphasis crossings, retaining walls beneath the I-595 bridges, and <br />landscape enhancements, integrating pedestrian-focused infrastructure <br />with compliant stormwater solutions. <br />Location: Broward County, FL. Dates: Ongoing. Reference: Robert Lopes, PE, <br />robert.lopes@dot.state.fl.us. <br />City of Belle Glade, Engineering Services to Design Basin H Stormwater <br />Improvements <br />As Project Manager and Engineer of Record, Hernan leads modeling and design <br />of stormwater infrastructure improvements serving existing communities <br />within Sub Basin H. He performs Hydrologic and Hydraulic modeling in <br />accordance with the City Stormwater Master Plan to support the design of <br />new drainage pipe systems, drainage structures, a downstream defender <br />device for water quality treatment, and a new outfall to the South Florida <br />Conservancy District canal. He integrates topographic and geotechnical data <br />and coordinates with survey, utility, and public works stakeholders to ensure <br />functionality, compliance, and constructability. <br />Location: Palm Beach County, FL. Dates: Ongoing. Reference: Neil Appel, CPM, <br />nappel@belleglade-fl.com. <br />Palm Beach County, Boca Rio Rd Widening from Palmetto Park Rd to <br />Glades Rd <br />Hernan leads the design and delivery of this corridor widening as Project Manager and Roadway Engineer of <br />Record, overseeing all roadway engineering and interdisciplinary coordination. The scope adds one through lane <br />28 Years of <br />Experience <br />Years with HBC <br />10 years <br />Education <br />M.S. in Environmental <br />Engineering, Texas A&M <br />University (2011) <br />B.S. in Civil Engineering, <br />Universidad Nueva <br />Esparta, Venezuela (1998) <br />Registration(s) <br />PE (FL) No. 74961 <br />(08/06/2012); PE (TX) No. <br />108728 (05/25/2011); TIN No. <br />L20032074 <br />Licenses & Certifications <br />Certified Floodplain <br />Manager (CFM) No. US-15- <br />08248 <br />Florida Certified Building <br />Contractor No. 160661 <br />TTC Advanced #38971 <br />Expertise <br />Drainage design, <br />stormwater management, <br />floodplain management, <br />permitting, roadway design,