A step -by -step guide to constructing the work including applicable sketches and drawings. Each step <br />will include the specified tolerances, quality risks and hold points for the operation. <br />An in- depth, operation- specific quality analysis, which will identify potential quality risks and include <br />a summary of pertinent specifications, allowable tolerances, hold points and any submittals or <br />certifications that are required. <br />Work plans will be reviewed to ensure that applicable codes, standards, specifications or other contractual <br />requirements are identified. The various members of the quality organization will ensure that work is <br />f <br />conducted in accordance with these work plans through inspection, testing and audits. Prior to construction <br />of each identifiable feature of work, or after a major change in construction operations, a pre- activity <br />meeting will be held with the City to ensure that all necessary planning has taken place, to communicate <br />the plan to all parties involved and to receive and incorporate feedback. <br />Build It. Our superintendents, field engineers, foremen and crews will use their expertise <br />i <br />and skills to construct the work in conformance with the project requirements. All deficient <br />items will be documented and corrected and the work procedures will be updated to <br />reflect the revised process. For example, after the first step is taken, our supervisors, <br />o City representatives and craft will meet to review the operation sequence and make any <br />necessary adjustments prior to the next operation. The execution cycle will begin once <br />the initial inspection has been completed and any corrective changes have been made. From this point, the <br />operation repeats, but it will be monitored and coordinated daily through the Play of the Day meetings and <br />process control and verification. <br />Check It. Inspection and testing are the cornerstone to successfully monitoring what <br />is being built in the field. This duty, as per contract, rests in the qualified hands of the <br />design - builder. As with past projects, we will use qualified independent materials <br />testing firms familiar with the City to perform this requirement. Inspection and testing <br />o• <br />requirements for all operations will be identified within the work plan, and these <br />requirements will be communicated to all members of the team at the preactivity and <br />Play of the Day meetings. <br />The Inspection and Testing Plan will serve as the guide to monitor and control the work; if needed, specific <br />procedures and documentation requirements will be developed for unique work. The procedures will <br />outline test requirements, acceptance criteria and test conditions. The procedure will also contain the test <br />and inspection checklist to be used. <br />@Kiewit Construction of the North Bay Road Pedestrian Emergency Bridge I No. 14 -09 -01 <br />