Our Schedule and Understanding of the Project Issues and Work Tasks <br />Project Issues <br />Permitting restrictions. The multitude of federal, state and local permitting requirements in southern <br />Florida can lead to a variety of project issues. Our team is very familiar with navigating permit restrictions <br />from the US Coast Guard, the US Army Corps of Engineers, the South Florida Water Management District <br />and the county's Department of Environmental Resources Management. In this case, the US Coast Guard <br />permit requires that the 4th span be maintained for marine navigation. In addition, the SFWMD permit <br />requires barges to maintain 1 ft. of clearance from the bottom of the channel. Due to shallow areas on the <br />south side of the bridge, barge- mounted equipment will have too much draft to maintain this requirement. <br />Our solution is to construct a temporary bridge or trestle. <br />MOT scheme. The creation of a comprehensive MOT scheme in advance is another project component that <br />could create issues for people who live and work nearby. We are highly skilled at creating and implementing <br />MOT plans that take into consideration the needs of the entire community. <br />North Bay Road to M <br />be used as staging ,3 - <br />area after soil mixing N <br />is completed' <br />Construct temporary <br />access on north side <br />for drilled shaft and Maintain Span <br />beam installation 4 throughout <br />construction for <br />- marine navigation <br />Construct temporary <br />access on south side <br />for drilled shaft and <br />beam installation <br />Tight access on <br />south side; wall <br />construction and <br />equipment access <br />s next to adjacent <br />MOT and _ condo; noise <br />coordination _ - ordinance in effect <br />will allow condo <br />residents access - <br />PKS Kiewit Construction of the North Bay Road Pedestrian Emergency Bridge I No. 14 -09 -01 <br />