operations, subcontract administration, and engineering supervision and support. Luke also served as
<br />Kiewit's Florida Operations Manager responsible for overseeing all bascule bridge construction in the State
<br />of Florida, and has developed strong relationships with many subcontracting firms, suppliers and vendors in
<br />the South Florida area.
<br />Role and Responsibilities on North Bay Road Pedestrian Bridge
<br />Luke is an industry leading Construction Manager because he is so dedicated to his projects and all
<br />personnel and subcontractors on his projects. He will manage the overall operations on site to include all
<br />scopes of work. Luke will work directly with Frank and Nick to properly staff the project and set the team
<br />up for success. His extensive history with leadership on past projects will prove to serve himself and the
<br />project team well. Luke take the quality of all projects that he is assigned very seriously and does not accept
<br />anything but the best from all direct hired local craft and subcontracted workers.
<br />Certifications, and Licenses
<br />NCCCO License # 100455369 LBC, TLL
<br />Project Experience
<br />Similar Projects
<br />Construction Manager, Bear Cut Bridge and West Bridge Rehabilitation, Miami -Dade County
<br />Public Works Department, Miami, Florida, $31 Million
<br />As Construction Manager, Luke was responsible for overseeing all construction aspects of the work and
<br />ensuring that all activities remained on schedule and within budget. This fast - track, $33 million design -
<br />build project involved removing, rehabilitating and replacing sections of the Bear Cut and West bridges on
<br />Rickenbacker Causeway in Miami. The scope also involved widening Bear Cut Bridge to provide dedicated
<br />paths for pedestrians and bicyclists on each side, as well as roadway and drainage improvements, signing
<br />and pavement markings, lighting, utility services and the installation of a 16" water main pipeline. The new
<br />superstructures at both bridges involve pre- cast /pre- stressed concrete.
<br />Construction Manager, Port Everglades, Broward County, Fort Lauderdale, FL, $3.8 Million
<br />The $60 million project was completed in four traffic control phases and included minor bridge demolition,
<br />the construction of a new steel bascule bridge with control tower, 30" pre- stressed concrete foundation
<br />oiling, 24" reinforced concrete abutment piling, two cofferdams, two concrete
<br />MKiewitConstruction of the North Bay Road Pedestrian Emergency Bridge I No. 14-09-01
<br />Construction Manager — Luke Silvus
<br />E +,r
<br />Luke has nearly 30 years of experience in extensive bridge construction
<br />"" V_
<br />involving structural steel and reinforced concrete structures throughout
<br />i the state of Florida. Luke specializes in bridge and elevated structures
<br />construction, and has extensive experience with projects involving work
<br />F
<br />near active rail lines and coordinating with FEC and other railways as well.
<br />He has performed assignments that involved field supervision, safety
<br />operations, subcontract administration, and engineering supervision and support. Luke also served as
<br />Kiewit's Florida Operations Manager responsible for overseeing all bascule bridge construction in the State
<br />of Florida, and has developed strong relationships with many subcontracting firms, suppliers and vendors in
<br />the South Florida area.
<br />Role and Responsibilities on North Bay Road Pedestrian Bridge
<br />Luke is an industry leading Construction Manager because he is so dedicated to his projects and all
<br />personnel and subcontractors on his projects. He will manage the overall operations on site to include all
<br />scopes of work. Luke will work directly with Frank and Nick to properly staff the project and set the team
<br />up for success. His extensive history with leadership on past projects will prove to serve himself and the
<br />project team well. Luke take the quality of all projects that he is assigned very seriously and does not accept
<br />anything but the best from all direct hired local craft and subcontracted workers.
<br />Certifications, and Licenses
<br />NCCCO License # 100455369 LBC, TLL
<br />Project Experience
<br />Similar Projects
<br />Construction Manager, Bear Cut Bridge and West Bridge Rehabilitation, Miami -Dade County
<br />Public Works Department, Miami, Florida, $31 Million
<br />As Construction Manager, Luke was responsible for overseeing all construction aspects of the work and
<br />ensuring that all activities remained on schedule and within budget. This fast - track, $33 million design -
<br />build project involved removing, rehabilitating and replacing sections of the Bear Cut and West bridges on
<br />Rickenbacker Causeway in Miami. The scope also involved widening Bear Cut Bridge to provide dedicated
<br />paths for pedestrians and bicyclists on each side, as well as roadway and drainage improvements, signing
<br />and pavement markings, lighting, utility services and the installation of a 16" water main pipeline. The new
<br />superstructures at both bridges involve pre- cast /pre- stressed concrete.
<br />Construction Manager, Port Everglades, Broward County, Fort Lauderdale, FL, $3.8 Million
<br />The $60 million project was completed in four traffic control phases and included minor bridge demolition,
<br />the construction of a new steel bascule bridge with control tower, 30" pre- stressed concrete foundation
<br />oiling, 24" reinforced concrete abutment piling, two cofferdams, two concrete
<br />MKiewitConstruction of the North Bay Road Pedestrian Emergency Bridge I No. 14-09-01
<br />
|