Laserfiche WebLink
operations, subcontract administration, and engineering supervision and support. Luke also served as <br />Kiewit's Florida Operations Manager responsible for overseeing all bascule bridge construction in the State <br />of Florida, and has developed strong relationships with many subcontracting firms, suppliers and vendors in <br />the South Florida area. <br />Role and Responsibilities on North Bay Road Pedestrian Bridge <br />Luke is an industry leading Construction Manager because he is so dedicated to his projects and all <br />personnel and subcontractors on his projects. He will manage the overall operations on site to include all <br />scopes of work. Luke will work directly with Frank and Nick to properly staff the project and set the team <br />up for success. His extensive history with leadership on past projects will prove to serve himself and the <br />project team well. Luke take the quality of all projects that he is assigned very seriously and does not accept <br />anything but the best from all direct hired local craft and subcontracted workers. <br />Certifications, and Licenses <br />NCCCO License # 100455369 LBC, TLL <br />Project Experience <br />Similar Projects <br />Construction Manager, Bear Cut Bridge and West Bridge Rehabilitation, Miami -Dade County <br />Public Works Department, Miami, Florida, $31 Million <br />As Construction Manager, Luke was responsible for overseeing all construction aspects of the work and <br />ensuring that all activities remained on schedule and within budget. This fast - track, $33 million design - <br />build project involved removing, rehabilitating and replacing sections of the Bear Cut and West bridges on <br />Rickenbacker Causeway in Miami. The scope also involved widening Bear Cut Bridge to provide dedicated <br />paths for pedestrians and bicyclists on each side, as well as roadway and drainage improvements, signing <br />and pavement markings, lighting, utility services and the installation of a 16" water main pipeline. The new <br />superstructures at both bridges involve pre- cast /pre- stressed concrete. <br />Construction Manager, Port Everglades, Broward County, Fort Lauderdale, FL, $3.8 Million <br />The $60 million project was completed in four traffic control phases and included minor bridge demolition, <br />the construction of a new steel bascule bridge with control tower, 30" pre- stressed concrete foundation <br />oiling, 24" reinforced concrete abutment piling, two cofferdams, two concrete <br />MKiewitConstruction of the North Bay Road Pedestrian Emergency Bridge I No. 14-09-01 <br />Construction Manager — Luke Silvus <br />E +,r <br />Luke has nearly 30 years of experience in extensive bridge construction <br />"" V_ <br />involving structural steel and reinforced concrete structures throughout <br />i the state of Florida. Luke specializes in bridge and elevated structures <br />construction, and has extensive experience with projects involving work <br />F <br />near active rail lines and coordinating with FEC and other railways as well. <br />He has performed assignments that involved field supervision, safety <br />operations, subcontract administration, and engineering supervision and support. Luke also served as <br />Kiewit's Florida Operations Manager responsible for overseeing all bascule bridge construction in the State <br />of Florida, and has developed strong relationships with many subcontracting firms, suppliers and vendors in <br />the South Florida area. <br />Role and Responsibilities on North Bay Road Pedestrian Bridge <br />Luke is an industry leading Construction Manager because he is so dedicated to his projects and all <br />personnel and subcontractors on his projects. He will manage the overall operations on site to include all <br />scopes of work. Luke will work directly with Frank and Nick to properly staff the project and set the team <br />up for success. His extensive history with leadership on past projects will prove to serve himself and the <br />project team well. Luke take the quality of all projects that he is assigned very seriously and does not accept <br />anything but the best from all direct hired local craft and subcontracted workers. <br />Certifications, and Licenses <br />NCCCO License # 100455369 LBC, TLL <br />Project Experience <br />Similar Projects <br />Construction Manager, Bear Cut Bridge and West Bridge Rehabilitation, Miami -Dade County <br />Public Works Department, Miami, Florida, $31 Million <br />As Construction Manager, Luke was responsible for overseeing all construction aspects of the work and <br />ensuring that all activities remained on schedule and within budget. This fast - track, $33 million design - <br />build project involved removing, rehabilitating and replacing sections of the Bear Cut and West bridges on <br />Rickenbacker Causeway in Miami. The scope also involved widening Bear Cut Bridge to provide dedicated <br />paths for pedestrians and bicyclists on each side, as well as roadway and drainage improvements, signing <br />and pavement markings, lighting, utility services and the installation of a 16" water main pipeline. The new <br />superstructures at both bridges involve pre- cast /pre- stressed concrete. <br />Construction Manager, Port Everglades, Broward County, Fort Lauderdale, FL, $3.8 Million <br />The $60 million project was completed in four traffic control phases and included minor bridge demolition, <br />the construction of a new steel bascule bridge with control tower, 30" pre- stressed concrete foundation <br />oiling, 24" reinforced concrete abutment piling, two cofferdams, two concrete <br />MKiewitConstruction of the North Bay Road Pedestrian Emergency Bridge I No. 14-09-01 <br />