<br />E. When you hire Ebsary Foundation Company you are hiring a truly local South Florida company
<br />who has a vested interest in the well-being of every Florida Client and Owner and must maintain
<br />a stellar local reputation. Ebsary’s primary office marine terminal/yard is located on the Miami
<br />River, in the same location since 1940, all key personnel live in either Dade or Broward County
<br />and the two unions we have collective bargaining agreements with are both based in Dade
<br />County. Ebsary’s Miami yard is large enough and the facilities to fabricate, load onto barges,
<br />stock pile materials maintain our equipment; so anytime unforeseen issues arise on the jobsite,
<br />the yard is only 50 minutes from the jobsite, which allows for immediate response without
<br />project delay.
<br />
<br />F. In the past 4 years, Ebsary Foundation Company has self-performed numerous Drilled Shafts for
<br />multiple projects with Port Everglades and Port Miami. In all cases, the drilled shafts were
<br />installed using steel casing and drilled and cleaned out with a Bauer Style Drill Rig. Ebsary
<br />owns a Bauer BG25 Drilled Shaft rig specifically set up to perform Drilled shaft work up to
<br />105ft long and a maximum diameter of 72”. Ebsary’s previous projects, within the past 4 years,
<br />that involved the installation of drilled shafts was Berth 27 & 29 High Wind Bollards; Berth 1
<br />High Wind Bollards, Port Everglades Port Wide Bollard Installation and Port Miami Wharves
<br />Strengthening Program. For these projects, Ebsary installed 66”, 36” and 30” diameter drilled
<br />shafts and drilled through rock that exceeded 10,000 PSI compressive strength (determined after
<br />core samples were tested) and achieved tip elevations up to -82 NGVD.
<br />
<br />G. Ebsary Foundation Company just completed, as the General Contractor, the Area 2 Seawall
<br />Construction, in February 2015, under budget and ahead of schedule, which was a $9,676,000
<br />project that consisted of many of the same construction aspects as this job will have. The Area 2
<br />project we successfully completed consisted of Maintenance of traffic and environmental
<br />protection including construction of temporary fencing and gates to define work area,
<br />Demolition, removal, relocation, and disposition of limestone riprap, live coral colonies, mono-
<br />pile breasting dolphins, and miscellaneous site features, Construction of approximately 625
<br />linear feet of new steel sheet pile bulkhead, anchor wall, and tie-back system, Construction of
<br />new reinforced concrete bulkhead cap, with double-bitt deck fittings and foam-filled fender
<br />systems, Dredging, excavating, stockpiling, handling, and disposing of dredge material off Port
<br />Miami property, Earthwork, including providing imported fill and backfill material, placing, and
<br />consolidating suitable imported material with vibro-replacement below EL. +3.00 ft, NGVD29
<br />and conventionally compact imported backfill above EL +3.00 ft, NGVD29, Extending the
<br />potable water and fire protection distribution system, providing fire hydrants, and potable water
<br />stations, with concrete enclosures, paved apron area, including heavy-duty asphaltic concrete
<br />pavement and base, storm water drainage and collection system, well, permanent fencing and
<br />gates, pavement markings and signage, Construction of new concrete retaining wall.