Laserfiche WebLink
Side (West) <br /> Pedestal 0 feet 7 feet 0 inches. <br /> Complies. <br /> Tower 20 feet 21 feet 3 inches <br /> Complies. <br /> 265-37.F(6)(a)[1]:Setbacks and Summary Chart B (No changes) <br /> Required Provided <br /> Phase Ill (Office Building) <br /> Front (North) <br /> Pedestal 15 feet 15 feet 6 inches <br /> Complies. <br /> Tower 25 feet 20 feet 0 inches <br /> (*)Doeslnot Comply. <br /> Rear (South) <br /> Pedestal 0 feet 20 feet 6 inches <br /> Complies. <br /> Tower 10 feet 20 feet 6 inches <br /> Complies. <br /> Side (East) <br /> Pedestal 15 feet 15 feet 6 inches. <br /> Complies. <br /> Tower 20 feet 20 feet 6 inches. <br /> Complies. <br /> Side (West) <br /> Pedestal 0 feet 0 feet 0 inches. <br /> Complies. <br /> Tower 25 feet 28 feet 8 inches <br /> Complies. <br /> (*) Approved variance under Resolution 12-Z-133 <br /> 4. 265-37.F (7) Minimum lot size: Complies. (No changes) <br /> Required: 10,000 square feet <br /> Provided: Phase II — 117,014 square feet. <br /> Phase III — 31,113 square feet. <br /> 5. 265-37. F (8) Minimum lot width: Complies. (No changes) <br /> Required: 100 feet (Chart E) <br /> Provided: Phase II — 530 feet <br /> Phase III — 162 feet <br /> 6. 265-37.F (9)(a)[1] Maximum height: Does not comply (No changes). <br /> Allowed: 290 feet with average being 200 feet — 140 feet maximum building height <br /> adjacent to Collins Avenue. <br /> Provided: Phase I Tower I = 200 feet <br /> Tower II = 200 feet <br /> Tower III = 190 feet <br /> D:PLANNING&ZONING200S'ZONING HEARING-APPLICATIONS■20 15 APPLICATIOMZ20 15-05 ST.TROPEZ MODIFICATION <br />