Laserfiche WebLink
Phase II Tower IV = 251 feet <br /> Tower V = 280 feet <br /> Phase III Office Bldg. = 152 feet (*) Variance requested and <br /> approved under 13-Z-137 <br /> Average Height = 214.16 feet (*) Variance requested and <br /> approved under 13-Z-137 <br /> 7. 265-37.F (10) Landscaping open space: Complies. (No changes) <br /> Allowed: Minimum 10% <br /> Provided: Phases I, II, and III = 14% <br /> 8. 265-37. F(11) Tower separation and tower width: Complies. (Nod changes) <br /> Required: Minimum 50 feet tower separation and maximum 200 feet tower width. <br /> Provided: Tower separation - Phase II = 128 feet <br /> Tower separation - Phase III= 57 feet <br /> Tower width - Phase I I = (Tower IV= 170 feet, Tower V= .164 feet) <br /> Tower width - Phase III= 107 feet <br /> 9. 265-46 Parking: <br /> Phase II (Changes based on new unit count) <br /> Phase Ill (No changes) <br /> Required Provided Comments <br /> Phase II <br /> Regular <br /> (Residential) 134 units below 603 Complies. Size requirement <br /> 1,800 sq ft = 201 (9' x18') 265 146 (7)(a) <br /> 186 units above <br /> 1,800 sq ft = 372 <br /> (Unassigned) 0 30 <br /> (Tandem) (100% allowed) (14%) 85 Complies <br /> (Commercial) 36 36 Complies. <br /> Handicap 13 Designated 13 Designated Complies. <br /> TOTAL 609 639 Complies. <br /> Loading 4 (10' x 25') 4 (10' x 25') Complies. <br /> Required Provided Comments I <br /> Phase Ill <br /> Regular <br /> (Office) 258 259 Complies. Size requirement <br /> (Commercial) 22 22 (9' x18') 265-46 (7)(a) <br /> Handicap 6 Designated 8 Designated Complies. <br /> TOTAL 280 281 Complies. <br /> Loading 2 (10' x 25') 2 (10' x 25') Complies. <br /> 6 <br /> U:\PLANNING&ZONING200S\ZONING HEAR ING-APPLICATIONSO015 APPLICATION\Z2015-05 ST.TROPEZ MODIFICATION <br />