Laserfiche WebLink
DRAFT <br /> Task 3: Needs Assessment <br /> The analyses provided above will point to various levels of need, for various modes. From this <br /> assessment a list of potential projects will be developed. Roadways that meet or exceed the <br /> existing level of service standard will need improvements to assure that they meet the City's <br /> adopted level of service standards. The roadway level of service is not the only consideration of <br /> need. The transit network will be examined to determine the adequacy of the system, as well as <br /> other modes. Public perception of need will be considered. The four project categories will be <br /> developed including: <br /> • Capacity <br /> Projects will be developed to address streets that have roadway capacity issues. These projects <br /> generally will focus on improving intersections and links that are at LOS D or worse, in the existing <br /> or future year. These will be mapped. <br /> • Alternative Mode <br /> This will focus on areas of transit, pedestrian, and bicycle and their proposed levels of service, <br /> particularly as they interface with major intersections, trip generators and transit stations. <br /> • Corridor Enhancement <br /> This work will take into consideration arterial roads that function as major conduits of traffic <br /> through the City. <br /> • Policy <br /> This will focus on policy initiatives which may help mitigate lack of mobility. These may include <br /> concurrency, Transportation Demand Management, and Transportation System Management <br /> measures. <br /> Task 4: Development of Potential Projects <br /> Potential projects that arise from the needs assessment resulting from the analysis will be placed <br /> in a "Project Bank", which will essentially be the City's Transportation Master Plan Capital <br /> Improvements schedule. Projects suggested in previous plans will be incorporated into the master <br /> plan. <br /> Each project will be conceptually developed. This will entail the development of a project sheet <br /> that provides: <br /> Description of the project <br /> Location <br /> • Cost <br /> -Planning <br /> -Design <br /> -Construction <br /> All projects will be cataloged by type in the project bank report. <br /> Sample Project Description Table <br /> 4 <br /> Bell David Planning Group <br /> 1019 NE 104th Street Miami Shores, FL 33138 <br /> SIB TMP and CTA 031815 <br />