My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 3:47:04 PM
Creation date
5/27/2015 2:16:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for Facility at 18080 Collins Ave
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
perkinswill.com 13 <br />+ HALLMARKS OF OUR APPROACH—COST CONTROL <br />Perkins+Will’s philosophy regarding the critical component of estimating <br />construction costs is to work with the stakeholder, General Contractor or Cost <br />Estimator in establishing project budgets and probable costs based on current <br />and reliable market data. <br />At the initiation of a project, when the scope and desired level of quality have <br />been defined, the team establishes a cost model for the project that itemizes <br />expected costs for major building systems. This cost model then becomes the <br />benchmark against which future planning and design decisions are made. This <br />method allows the team, when necessary, to test a particular component of the <br />design to determine its compliance with the established budget. <br />Typically, comprehensive cost analysis (in addition to the aforementioned cost <br />model) based on drawings and specifications are provided at Schematic Design, <br />Design Development, 50% Construction Documents, and 90% Construction <br />Documents <br />Perkins+Will has extensive and successful experience with establishing and <br />meeting the budget for projects.
The URL can be used to link to this page
Your browser does not support the video tag.