Laserfiche WebLink
STAGING AND SITE CLEANLINESS <br />PASCHEN EMERALD JV will work with the <br />Owner to develop the most efficient staging <br />plan to minimize any inconvenience. The <br />staging plan shall include but not be limited <br />to the following: <br />• Construction site cleanliness <br />• Dust control <br />• Site safety and access <br />• Equipment movement <br />• Truck and delivery access <br />• Off-site storage <br />• Construction worker access <br />• Demolition and debris removal <br />• Pedestrian access outside of the construction areas <br />Debris will be kept to a minimum, and construction site cleanliness will be a priority. Any demolition <br />activities will be broom-swept as they occur. PASCHEN EMERALD JV will stage all surplus work materials <br />behind temporary partitions. Any materials staged outside of these areas shall be for immediate use of the <br />particular construction task for which the materials are required. <br />As with all of our renovation and build-out projects, we will work hand-in-hand with Owner’s staff to <br />minimize disruptions. This will be accomplished by keeping open lines of communication and <br />maximizing efficiency during any periods in which the area is not occupied or minimally utilized. Utility <br />shutdowns, work that creates a large amount of noise or other activities that should only be done when <br />the area is as vacated as possible will be coordinated with you accordingly. PASCHEN EMERALD JV <br />will coordinate process plans, shut-down notices, and any needed signage, graphics and/or illustrations <br />required, all in order to keep all parties informed of changes in access/egress routes as needed throughout <br />the duration of the project. <br />QUALITY <br />The PASCHEN EMERALD JV Team takes its responsibility to monitor and control quality very seriously. Our <br />process assures that all work will be in compliance with the Contract Documents and meet all applicable <br />federal, state, local, and department building codes. <br />• Project: Our Project Superintendent will conduct regular inspections of the jobsite to ensure that all <br />work is being installed to the established standards of quality. The Project Manager will fortify his efforts <br />with their daily project oversight. Any unsatisfactory work will be rejected and reinstalled as required <br />throughout the project, so that the punch-list by the final walkthrough is minimal. <br />• Personnel: Our program begins by hiring the best subcontractors, who not only provide competitive <br />pricing but also deliver a quality product. At contract negotiation, we will define the level of quality <br />D. PROJECT APPROACH AND UNDERSTANDING