My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCM LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
MCM LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:28:38 AM
Creation date
9/24/2015 10:27:11 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM <br />A <br />R <br /> <br />fo <br />R G <br />ov <br />e <br />RnMen <br />t <br /> C <br />en <br />t <br />e <br />R A <br />nn <br />e <br />x <br /> At 1 <br />8 <br />0 <br />8 <br />0 <br /> <br />C <br />ol <br />l <br />i <br />n <br />s <br /> A <br />ve <br />n <br />u <br />e <br />| <br />R <br />eq <br />u <br />e <br />s <br />t <br /> fo <br />R quAli <br />f <br />i <br />CA <br />ti <br />o <br />n <br />s <br /> | <br /> <br />no. <br />1 <br />5 <br />- <br />0 <br />8 <br />- <br />0 <br />2 <br />20Construction with a Personal Touch <br />RELATED EXPERIENCE <br />StatusCompleted 02/2014 <br />Delivery Method <br />Design-Bid-Build <br />Project Size/Contract Value <br />400,000 SF | $48.9 M <br />Brief Description of Work Performed <br />This project consists of extensive historical renovations, additions, <br />and alterations to the oldest high school in South Florida.Work is <br />scheduled under three major phases with the first phase consisting of <br />construction of new buildings around the existing occupied campus. <br />This added three new multi-story classroom buildings, a 3-story <br />precast parking garage, new Central Energy Plant housing the “New <br />Heart” of the campus. Phase Two shifted students from the historical <br />buildings into the newly constructed classrooms allowing for a <br />complete renovation of the historic buildings. This included installation <br />of new hurricane impact windows, HVAC, Electrical, Plumbing and <br />Fire Sprinkler systems. Under this phase the Media Center was <br />overhauled and the decorative steel trusses exposed. Additionally, the <br />1,132 fixed seat Auditorium received new seating, lighting and sound <br />systems. Phase Three consists of overall site improvements, including <br />new irrigation and landscaping in Columbia Park, construction of <br />Stingaree Plaza, dedicated student drop-off and pick-up areas and all <br />other miscellaneous hardscape upgrades. When completed in 2014, <br />the school’s capacity increased from 1,649 to 2,800 student stations. <br />Owner or Agency <br />Victor Alonso, RA <br />Administrative Director <br />Miami-Dade County Public <br />Schools (MDCPS) <br />1450 NE 2nd Avenue, <br />Miami, FL 33132 <br />Ph: (305) 995-4606 <br />Architect/Engineer <br />Jose Murguido, Principal <br />Zyscovich Architects <br />100 N. Biscayne Blvd., 27th Floor, <br />Miami, FL 33132 <br />Ph: (305) 372-5222 x1150 <br />Key Personnel <br />Joe Fernandez <br />Armando Perez <br />Eddie Martinez <br />Ruben Bravo <br />Tony Manning <br />MIAMI SENIOR HIGH SCHOOL <br />MIAMI, FL <br />SIMILARITIES TO YOUR PROJECT <br />• Construction of <br />educational spaces <br />• Flexible-Use Spaces <br />• Urban site conditions <br />• Construction adjacent to <br />occupied structures <br />• spaces use for community <br />and civic purposes
The URL can be used to link to this page
Your browser does not support the video tag.