My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCM LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
MCM LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:28:38 AM
Creation date
9/24/2015 10:27:11 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM <br />A <br />R <br /> <br />fo <br />R G <br />ov <br />e <br />RnMen <br />t <br /> C <br />en <br />t <br />e <br />R A <br />nn <br />e <br />x <br /> At 1 <br />8 <br />0 <br />8 <br />0 <br /> <br />C <br />ol <br />l <br />i <br />n <br />s <br /> A <br />ve <br />n <br />u <br />e <br />| <br />R <br />eq <br />u <br />e <br />s <br />t <br /> fo <br />R quAli <br />f <br />i <br />CA <br />ti <br />o <br />n <br />s <br /> | <br /> <br />no. <br />1 <br />5 <br />- <br />0 <br />8 <br />- <br />0 <br />2 <br />21Construction with a Personal Touch <br />MIAMI-DADE FIRE RESCUE TRAINING FACILITY <br />DORAL, FL <br />Owner or Agency <br />Angel Lamela, Division Manager <br />Miami-Dade Fire Rescue <br />Department <br />Ph: 305.799.7889 <br />E: alamela@miamidade.gov <br />Architect/Engineer <br />Anthony Valino, Project Manager <br />AECOM Design <br />Ph: 305.444.4691 <br />E: Anthony.valino@aecom.com <br />Key Personnel <br />Armando Perez <br />Eddie Martinez <br />Juan Campos <br />RELATED EXPERIENCE <br />SIMILARITIES TO YOUR PROJECT <br />• Construction of <br />educational spaces <br />• Flexible-Use Spaces <br />• Construction adjacent <br />to occupied government <br />facility <br />• Municipal facility <br />Status <br />Completed 07/2010 <br />Delivery Method <br />Design-Bid-Build <br />Project Size/Contract Value <br />58,000 SF | $ 25.2 M <br />Brief Description of Work Performed <br />The scope of this project required the complete construction of 11 <br />buildings and miscellaneous steel structures in a 10 acre mock <br />cityscape setting for advanced training for the Miami Dade Fire and <br />Rescue Department. The main components included the construction <br />of four pre-engineered structural steel buildings for vehicle extrication <br />and outdoor training, a storage building and a 58,000 SF tilt-up <br />concrete panel Trade School Building, housing offices, flex-use spaces, <br />classrooms, gym and locker room facilities, a fully functioning mock <br />fire station and 260,000 gallon pool. In addition to these structures, <br />15 Live Fire Training Props were installed in and around four training <br />buildings constructed to resemble a six-story Apartment Tower, <br />Residential House, Commercial/Industrial Building and Maritime <br />Ship. These fire training props were fed by approximately 2,500 LF of <br />underground liquid petroleum and vapor gas lines connected to an <br />18,000 gallon LP Gas tank.
The URL can be used to link to this page
Your browser does not support the video tag.