Laserfiche WebLink
CM <br />A <br />R <br /> <br />fo <br />R G <br />ov <br />e <br />RnMen <br />t <br /> C <br />en <br />t <br />e <br />R A <br />nn <br />e <br />x <br /> At 1 <br />8 <br />0 <br />8 <br />0 <br /> <br />C <br />ol <br />l <br />i <br />n <br />s <br /> A <br />ve <br />n <br />u <br />e <br />| <br />R <br />eq <br />u <br />e <br />s <br />t <br /> fo <br />R quAli <br />f <br />i <br />CA <br />ti <br />o <br />n <br />s <br /> | <br /> <br />no. <br />1 <br />5 <br />- <br />0 <br />8 <br />- <br />0 <br />2 <br />24Construction with a Personal Touch <br />Armando Perez, P.E., Chief Estimator <br />Summary of Qualifications <br />Armando Perez has over 41 years of comprehensive experience in Building <br />Construction projects in the Municipal, Commercial, Aviation, Educational, and <br />Residential market sectors. He is a graduate of Florida International University and is <br />a licensed Professional Engineer. Armando is also a State of Florida Certified Uniform <br />Building Code Inspector, General Contractor and a LEED accredited professional. <br />Relevant Project Experience Summary <br />MIRAMAR READINESS CENTER, Miramar, FL <br />Cost: $19.9 M | Delivery Method: CM At-Risk <br />Scope of Work: This project consists of building a new 102,000 SF Readiness Center <br />Facility to support the training and readiness of the local Army National Guard units <br />serving the region. Located on a 30 acre site within the city of Miramar in Southwest <br />Broward County, the Readiness Center will also include a 456 Privately Owned <br />Vehicles (POV) parking area, a 125,000 SF Military Owned Vehicles (MOV) parking <br />area, storm water retention areas, and other site improvements. The Project has <br />been registered with the U.S. Green Building Council’s (USGBC) to achieve a LEED <br />Silver rating. <br />HOMESTEAD CITY HALL, Homestead, FL <br />Cost: $25.5 M | Delivery Method: Design-Bid-Build <br />Scope of Work: The project consist of building an 84,000 SF, 3-story City Hall , including <br />Council Chambers with fixed-seating for over 250 people; Emergency Operations <br />Command Center; Offices for the Mayor, City Manager, and Council Members; <br />New Building Department, Public Works Department, and other administrative and <br />government support spaces; site utility work, including the construction of over 2,500 <br />LF of 15” to 24” HDPE drainage pipe; a 140,000 SF exterior concrete plaza; 3,000 <br />SF exterior structural arcade; misc. Hardscapes and landscaping. <br />10TH ST. AUDITORIUM & BEACH PATROL HEADQUARTERS, Miami Beach, FL <br />Cost: $6.6 M | Delivery Method: CM At-Risk <br />Scope of Work: This project consists of the partial restoration, renovation and addition <br />to existing two-story Auditorium/Beach Patrol Headquarters facility, improvements to <br />accessibility, life safety and partial site improvements included. <br />NORMAN S. EDELCUP SUNNY ISLES BEACH K-8, Sunny Isles Beach, FL <br />Cost: $28.5 M | Delivery Method: CM At-Risk <br />Scope of Work: Construction Management at Risk of a new Multi-story K-8 Facility <br />designed to house 1,642 student stations on 2.1 acres in the City of Sunny Isles. The <br />school is organized on a “School-within-a-School” concept and totals approximately <br />145,000 gross square feet, including a 4 story classroom building. Additionally, a <br />separate 3 story parking garage was also built. <br />MIAMI SENIOR HIGH SCHOOL, Miami, FL <br />Cost: $54.4 M | Delivery Method: Design-Bid-Build <br />Scope of Work: This project included comprehensive improvements to all building <br />systems and interior finishes; the construction, tie-in, testing and commissioning of <br />a new Central Energy Plant; the construction of three (3) new classroom buildings; <br />significant low voltage/data system upgrades; major landscaping improvements; <br />and a total retrofit and upgrade of both the auditorium and gymnasium. Pedestrian <br />traffic was re-routed dozens of times, without a single safety incident involving <br />students, faculty, staff, or visitors to the campus. The campus underwent numerous <br />improvements, including upgrades to the courtyard spaces, comprehensive <br />landscaping upgrades, and improvements to both athletic fields and parks. <br />Years of Experience <br />MCM: 12 years <br />Other Firms: 29 years <br />Current Assignment <br />Corporate Office <br />100% Availability for this <br />Project <br />Education <br />Bachelor of Science in <br />Structural Engineering, <br />Florida International <br />University, 1976 <br />Registrations & <br />Professional Affiliations <br />• Registered Professional <br />Engineer, Florida <br /># 28026 <br />• Florida Certified <br />General Contractor # <br />CGC009896 <br />• Florida Certified Uniform <br />Building Code Inspector <br />• LEED AP BD+C <br />PRE-CONSTRUCTION STAFF EXPERIENCE