My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCM LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
MCM LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:28:38 AM
Creation date
9/24/2015 10:27:11 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM <br />A <br />R <br /> <br />fo <br />R G <br />ov <br />e <br />RnMen <br />t <br /> C <br />en <br />t <br />e <br />R A <br />nn <br />e <br />x <br /> At 1 <br />8 <br />0 <br />8 <br />0 <br /> <br />C <br />ol <br />l <br />i <br />n <br />s <br /> A <br />ve <br />n <br />u <br />e <br />| <br />R <br />eq <br />u <br />e <br />s <br />t <br /> fo <br />R quAli <br />f <br />i <br />CA <br />ti <br />o <br />n <br />s <br /> | <br /> <br />no. <br />1 <br />5 <br />- <br />0 <br />8 <br />- <br />0 <br />2 <br />25Construction with a Personal Touch <br />Ruben Bravo, LEED Manager/Sustainable Construction <br />Summary of Qualifications <br />Ruben Bravo has 15 years of experience in the construction industry with a focus on <br />sustainable construction. He is a LEED Accredited Professional, Green Advantage <br />Certified, and served as the Green Schools Chair for the USGBC South Florida. He is <br />deeply committed to the implementation of sustainable construction practices at all <br />of MCM’s projects and served as the LEED Manager on the ISD Trade Shops Facility <br />which is the first LEED Silver certified building owned by Miami-Dade County, the <br />ISD West Lot Mixed-Use Facility and the Port of Miami Terminal D Expansion project. <br />All three of these projects achieved their LEED Certification goal with the later two <br />projects exceeding the clients certification requirements. <br />Recent Project Experience Summary <br />MIRAMAR READINESS CENTER, Miramar, FL <br />Cost: $19.9 M | Delivery Method: CM At-Risk <br />Scope of Work: This project consists of building a new 102,000 SF Readiness Center <br />Facility to support the training and readiness of the local Army National Guard units <br />serving the region. Located on a 30 acre site within the city of Miramar in Southwest <br />Broward County, the Readiness Center will also include a 456 Privately Owned <br />Vehicles (POV) parking area, a 125,000 SF Military Owned Vehicles (MOV) parking <br />area, storm water retention areas, and other site improvements. The Project has <br />been registered with the U.S. Green Building Council’s (USGBC) to achieve a LEED <br />Silver rating. <br />10TH ST. AUDITORIUM & BEACH PATROL HEADQUARTERS, Miami Beach, FL <br />Cost: $6.6 M | Delivery Method: CM At-Risk <br />Scope of Work: This project consists of the partial restoration, renovation and addition <br />to existing two-story Auditorium/Beach Patrol Headquarters facility, improvements to <br />accessibility, life safety and partial site improvements included. <br />MIAMI SENIOR HIGH SCHOOL, Miami, FL <br />Cost: $54.4 M | Delivery Method: Design-Bid-Build <br />Scope of Work: This project included comprehensive improvements to all building <br />systems and interior finishes; the construction, tie-in, testing and commissioning of <br />a new Central Energy Plant; the construction of three (3) new classroom buildings; <br />significant low voltage/data system upgrades; major landscaping improvements; <br />and a total retrofit and upgrade of both the auditorium and gymnasium. Pedestrian <br />traffic was re-routed dozens of times, without a single safety incident involving <br />students, faculty, staff, or visitors to the campus. The campus underwent numerous <br />improvements, including upgrades to the courtyard spaces, comprehensive <br />landscaping upgrades, and improvements to both athletic fields and parks. <br />MIAMI-DADE ISD TRADE SHOPS, Miami, FL <br />Cost: $13.1 M | Delivery Method: Design-Build <br />Scope of Work: This design-build project was the first Miami-Dade County LEED <br />Silver Certified facility utilized by County employees and is now home to the Internal <br />Services Division, Design and Construction Services Division. <br />MIAMI-DADE ISD WEST LOT MULTI-USE PARKING FACILITY, Miami, FL <br />Cost: $15.4 M | Delivery Method: Design-Build <br />Scope of Work: The ISD West Lot Project was MCM’s second Design-build Project <br />for Miami-Dade County General Services Administration and achieved a LEED Gold <br />Certification. This 6-story pre-cast parking facility occupies the entire 1.73 acre <br />project site and is comprised of 810 parking spaces dispersed across 324,000 SF of <br />parking area; additionally, 45,000 SF of office space on four floors, plus 10,000 SF <br />of retail space on the Ground Floor were also constructed. <br />Years of Experience <br />MCM: 8 years <br />Other Firms: 7 years <br />Current Assignment <br />Our Lady Of Guadalupe <br />100% Availability for this <br />Project <br />Education <br />M.S. in Construction <br />Management, <br />Florida International <br />University, 2008 <br />Master in Construction <br />Management and R.E. <br />Development, P. University <br />Catholic of Chile, 1998 <br />B.A. in Civil Construction <br />Technology, P. University <br />Catholic of Chile, 1996 <br />Registrations & <br />Professional Affiliations <br />• LEED AP BD+C <br />• Green Advantage <br />PRE-CONSTRUCTION STAFF EXPERIENCE
The URL can be used to link to this page
Your browser does not support the video tag.