My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCM LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
MCM LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:28:38 AM
Creation date
9/24/2015 10:27:11 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM <br />A <br />R <br /> <br />fo <br />R G <br />ov <br />e <br />RnMen <br />t <br /> C <br />en <br />t <br />e <br />R A <br />nn <br />e <br />x <br /> At 1 <br />8 <br />0 <br />8 <br />0 <br /> <br />C <br />ol <br />l <br />i <br />n <br />s <br /> A <br />ve <br />n <br />u <br />e <br />| <br />R <br />eq <br />u <br />e <br />s <br />t <br /> fo <br />R quAli <br />f <br />i <br />CA <br />ti <br />o <br />n <br />s <br /> | <br /> <br />no. <br />1 <br />5 <br />- <br />0 <br />8 <br />- <br />0 <br />2 <br />31Construction with a Personal Touch <br />Years of Experience <br />MCM: 13 years <br />Other Firms: 5 years <br />Current Assignment <br />Ravenswood Bus <br />Maintenance Facility <br />100% Availability for this <br />Project <br />Education <br />Bachelor of Science in <br />Construction Management, <br />Florida International <br />University 2001 <br />Registrations & <br />Professional Affiliations <br />• OSHA 500 Hour <br />• CPR/First Aid Certified <br />• USACE Construction <br />Quality Manager <br />• Dept. of Environmental <br />Protection - Storm Water/ <br />Erosion Control Certified <br />Inspector/Instructor <br />• Intermediate & Advanced <br />Maintenance of Traffic <br />Supervisor <br />• FDOT Flagger Training <br />• OSHA Competent Person <br />Training <br />• Scaffold <br />• Excavation <br />• Confined Space <br />• Fall Protection <br />Eddie Martinez, Safety Manager <br />Summary of Qualifications <br />Eddie Martinez oversees and controls Corporate Safety Compliance for all MCM <br />Projects. He manages a staff of qualified Safety Managers and Representatives on each <br />project that report directly to him. Eddie and his team conduct weekly safety meetings <br />at all job sites and routinely perform random safety inspections in order to enforce <br />the highest standards of safety at all times. Eddie is a strong communicator and is <br />continuously looking for ways to improve policies and procedures at MCM, where <br />safety is already a firm cornerstone of the corporate philosophy. Among his many <br />Certifications are those for OSHA-500 and Maintenance of Traffic-Advanced, as well <br />as, the United States Army Corp of Engineers Quality Control Manager designation. <br />Relevant Project Experience Summary <br />NORMAN S. EDELCUP SUNNY ISLES BEACH K-8, Sunny Isles Beach, FL <br />Cost: $31.6 M | Delivery Method: CM At-Risk <br />Scope of Work: Construction Management at Risk of a new 165,000 SF Multi-story <br />K-8 Facility designed to house 1,642 student stations on 2.1 acres in the City of Sunny <br />Isles Beach. This fast-track three phase project consisted of multiple GMP packages <br />which were issued for demolition of an existing apartment building, construction of <br />the new schools extensive foundations and a shell and finish package. Under the <br />final GMP package, a new 4-story pre-cast double-tee parking garage with 145 <br />parking spaces was constructed. The ground level of this garage included spaces for <br />housing Physical Education Areas, an emergency generator, fire sprinkler control and <br />mechanical chiller rooms. <br />WESTLAND HIALEAH SENIOR HIGH SCHOOL, Hialeah, FL <br />Cost: $51.4 M | Delivery Method: Design-Build <br />Scope of Work: Design-Build of a new 322,084 SF Senior High School complex <br />composed of multiple buildings and paved courtyards with a capacity of 1,839 <br />student stations. One of the key components of the project was a multi-story 154,000 <br />SF parking garage with 288 parking spaces that incorporated a rooftop gymnasium <br />classrooms and other conditioned spaces; along with open air hard courts for <br />basketball, volleyball and other sports, also on the rooftop of the multi-story parking <br />garage. <br />AVENTURA GOVERNMENT CENTER PARKING EXPANSION, Aventura, FL <br />Cost: $3.8 M | Delivery Method: Design-bid-Build <br />Scope of Work: This project involved the demolition of an existing parking lot and <br />the construction of a new precast parking garage with a capacity of 207 cars. Scope <br />included precast concrete parking structure, storefront curtain walls, site work, <br />concrete sidewalks, signage, elevators, and landscaping. All MEPF systems were <br />integrated with the existing City Hall Building. <br />MIAMI-DADE ISD WEST LOT MULTI-USE PARKING FACILITY, Miami, FL <br />Cost: $15.4 M |Delivery Method: Design-Build <br />Scope of Work: The ISD (formerly GSA) West Lot Project was MCM’s second Design- <br />build Project for Miami-Dade County Internal Services Department and achieved a <br />LEED Gold Certification. This 6-story pre-cast parking facility occupies the entire 1.73 <br />acre project site and is comprised of 810 parking spaces dispersed across 324,000 SF <br />of parking area; additionally, 45,000 SF of office space on four floors, plus 10,000 SF <br />of retail space on the Ground Floor were also constructed <br />CONSTRUCTION STAFF EXPERIENCE
The URL can be used to link to this page
Your browser does not support the video tag.