My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Skanska
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Skanska
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:56:13 AM
Creation date
9/24/2015 10:53:25 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach Government Center Annex | RFP# 15-08-02 <br />D. Project Approach and Understanding <br />Page 15 <br /> •Subcontractor field offices/trailer locations <br /> •Bathroom or portable sanitary facilities <br /> •Construction staging and storage zones <br /> •Temporary dust partitions/barricades <br /> •Construction equipment access to the building structure(s) <br /> •Temporary facilities for construction personnel <br /> •Storage/removal of construction material <br /> •Material distribution and hoisting areas <br /> •Construction personnel circulation <br /> •Rubbish removal and dumpsters <br />We will further develop these preliminary plans with the valuable input from the city operations <br />personnel and other members of the project team as we move forward, to ultimately arrive at the <br />best approach for both the city and the project. Doing so will result in an efficient work site with <br />enhanced safety, productivity and quality to achieve the project’s objectives. The site logistics plan <br />will be updated (as needed) during the project life cycle. <br />Environmental Health and Safety (EHS) Plan: As part of the pre-construction services <br />the safety and environmental site specific plan will be developed. The plan will have the written <br />documentation that describes the contractors environmental and site safety procedures. The plan <br />will be included in the subcontractors bid packages to ensure that all the EHS requirements are <br />covered by the companies working at the job site.
The URL can be used to link to this page
Your browser does not support the video tag.