Laserfiche WebLink
City of Sunny Isles Beach Government Center Annex | RFP# 15-08-02 <br />D. Project Approach and Understanding <br />Page 15 <br /> •Subcontractor field offices/trailer locations <br /> •Bathroom or portable sanitary facilities <br /> •Construction staging and storage zones <br /> •Temporary dust partitions/barricades <br /> •Construction equipment access to the building structure(s) <br /> •Temporary facilities for construction personnel <br /> •Storage/removal of construction material <br /> •Material distribution and hoisting areas <br /> •Construction personnel circulation <br /> •Rubbish removal and dumpsters <br />We will further develop these preliminary plans with the valuable input from the city operations <br />personnel and other members of the project team as we move forward, to ultimately arrive at the <br />best approach for both the city and the project. Doing so will result in an efficient work site with <br />enhanced safety, productivity and quality to achieve the project’s objectives. The site logistics plan <br />will be updated (as needed) during the project life cycle. <br />Environmental Health and Safety (EHS) Plan: As part of the pre-construction services <br />the safety and environmental site specific plan will be developed. The plan will have the written <br />documentation that describes the contractors environmental and site safety procedures. The plan <br />will be included in the subcontractors bid packages to ensure that all the EHS requirements are <br />covered by the companies working at the job site.