My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Skanska
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Skanska
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:56:13 AM
Creation date
9/24/2015 10:53:25 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach Government Center Annex | RFP# 15-08-02 <br />K. Project Management Services <br />Page 55 <br /> •Management Control Schedule (during <br />Construction Documents Stage) - This schedule <br />covers the detailed activities for all phases of the <br />project. It will allow for information that is coded and <br />sorted by subcontract, work package, work area and <br />project phase. <br />Several factors (internal and external) are taken into <br />consideration when developing each of the listed schedules: <br /> •Internal Factors <br /> -Scope of work <br /> -Building systems and Materials <br /> -Methods and Constructability <br /> -Alternatives and Design Considerations <br /> -Purchasing and Material Lead Times <br /> •External Factors <br /> -Governmental Center activities and events <br /> -Impact on Building Activities (limiting parking, <br />creating noise, etc.) <br />Upon the inclusion of these internal and external factors, the <br />following key components are highlighted at each schedule <br />level: <br /> •Design <br /> •City of Sunny Isles Beach Review <br /> •South Florida Water Management District Review <br /> •Miami-Dade County Utility Permitting Review <br /> •Pre-construction <br /> •Procurement <br /> •City of Sunny Isles Beach Permitting <br /> •Construction <br /> •City of Sunny Isles Beach Occupancy <br /> •Close-out Activities <br />During the construction phase: <br /> •The project schedule will be incorporated into every <br />subcontract. <br /> •The project schedule will be reviewed and <br />updated after Weekly progress meetings where the <br />subcontractors review and evaluate a three-week <br />“look ahead” snap shot of the project schedule to <br />ensure focus on upcoming events and detailed <br />coordination with City of Sunny Isles Beach Facilities. <br /> •Weekly City of Sunny Isles Beach meetings are <br />scheduled to highlight current progress and <br />upcoming activities are reviewed with City of Sunny <br />Isles Beach. <br /> •Periodic mechanical and electrical coordination <br />meetings are scheduled with associated <br />subcontractors. <br /> •Periodic sessions with appropriate team members <br />are scheduled to “correct” any areas of slow down or <br />delay which may impact City of Sunny Isles Beach, <br />subcontractors or the critical path. <br />If changes and/or unforeseen conditions occur during the <br />construction phase, the following techniques will be utilized <br />to evaluate the impact and to develop the recovery strategies: <br /> •Development of a critical path method (CPM) <br />schedule for all new activities resulting from changes <br />or unforeseen schedule impacts. <br /> •Integration of new activities into the total project <br />schedule. <br /> •Tracking the resulting critical path schedule to <br />identify impact to final completion. If the completion <br />date has been threatened, we will review the <br />Team members engaged during the scheduling process. Everyone <br />participates and takes ownership in the master project schedule.
The URL can be used to link to this page
Your browser does not support the video tag.