My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Skanska
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Skanska
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:56:13 AM
Creation date
9/24/2015 10:53:25 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach Government Center Annex | RFP# 15-08-02 <br />K. Project Management Services <br />Page 56 <br />constraints and durations of each critical path activity. <br />If the critical path is impacted, we will investigate <br />the influence of the additional manpower to shorten <br />activity durations and the impact of adding crews to <br />eliminate sequencing constraints <br />In addition to utilizing scheduling methodologies for <br />schedule recovery, Skanska will utilize all the remedies <br />available contractually with any and all subcontractors <br />whose work has fallen behind, including requiring them <br />to work overtime, additional shifts, or provide additional <br />manpower or materials. <br />b. Quality Control (design & construction) <br />Achieving the highest levels of quality requires a cooperative <br />effort by the entire project team throughout all phases of the <br />project. Skanska will work in conjunction with City of Sunny <br />Isles Beach, Perkins + Will, the design consultants and <br />collaborative experts to develop a quality control standard <br />that exceeds City of Sunny Isles Beach’s objectives. <br />During the design and pre-construction phase, the <br />partnering sessions with the collaborative experts are <br />repeated at every stage allowing the estimates and the design <br />considerations presented to City of Sunny Isles Beach to be <br />refined. This in turn minimizes conflicts, enhances safety, <br />schedule and construction activities. <br />At each stage of the design and pre-construction phase, we <br />will review the design documents for conflicts and missing <br />information and submit Pre-construction RFI’s requesting <br />clarification of these items and any items noted by our <br />collaborative design experts, vendors and bidders. <br />During construction phase, Skanska will ensure that the <br />submittals and installations are done correctly the first time <br />in order to achieve Zero Defects. <br />To accomplish Zero Defects, constant and competent <br />supervision is the most important factor. We will <br />demonstrate a consistent effort to monitor all aspects of the <br />project through implementing: <br /> •Subcontractor Quality Orientation - The <br />subcontractor quality orientation aims to: <br /> -Define the processes and procedures by which <br />the construction is to progress and by which <br />efficiency and productivity are to be improved. <br /> -Set expectation benchmarks and aim at exceeding <br />them throughout construction. <br /> •Construction Quality Follow-Ups - The <br />Construction Quality Follow-Ups aim to monitor <br />ongoing work segments to assure continuing <br />conformance. The quality follow-ups shall be <br />documented to assure complete execution and shall <br />be completed daily, or as frequently as necessary. <br />The following tests shall be utilized as follow-up <br />inspections: <br /> -Utilities Tests <br /> -Plumbing Rough-In Tests <br /> -Electrical Rough-In Tests <br /> -Mechanical Component and Utilization <br />Inspections <br />Skanska will also promote an awareness of and concern for <br />quality issues in every aspect of the project and through: <br /> •Daily Reports quality discussions <br /> •Weekly quality workshops <br /> •Weekly discussions at Owner/Architect/Construction <br />Manager meetings <br /> •Weekly discussions at Subcontractor meetings <br /> •Monthly updates to the subcontractor management <br /> •Project Specific Quality Recognition programs <br /> •Periodic Quality Alert Flashes <br /> •Communication and Project Documentation <br />Consideration shall be given to submittal sequencing. <br />Materials that are needed first will be submitted first with <br />additional attention to long lead items. We will carefully <br />examine the contract documents for all requirements for the <br />approval of materials to be submitted such as shop drawings, <br />data, test results, schedules and samples. <br />Skanska will review the contract documents for conflicts <br />and missing information and submit RFI’s requesting <br />clarification of these items and any item submitted by the <br />subcontractors. <br />Skanska will keep one set of contract documents designated <br />and marked for record. This record set of documents
The URL can be used to link to this page
Your browser does not support the video tag.