My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2459
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 11:42:01 AM
Creation date
10/12/2015 4:21:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2459
Date (mm/dd/yyyy)
09/17/2015
Description
Ratify Agmt w/ Perkins+Will for Arch. Design Srvcs for a New BLDG at 18080 Collins
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS +WILL <br /> PHASE 4: DOCUMENTATION + BIDDING <br /> Preparing the Design to be Constructed <br /> 4 . <br /> Close attention to quality and detail characterizes Perkins+Will philosophy on the documentation and bidding <br /> phases of a project. <br /> Construction Documentation <br /> — - - - Upon-approval of the design development document phase, and based-on-the selected alternative system. <br /> studies, the design team prepares complete construction documents. The construction documents consist of <br /> contract drawings, specifications, general conditions, instructions to bidders, and other necessary documents. <br /> The team also assists the owner in filing the required documents for approval of municipal authorities having <br /> jurisdiction over the project. <br /> Bidding <br /> After construction documents are made available to bidders, the design team responds to requests for informa- <br /> tion and prepares and issues and addenda that may be required. <br /> The design team will assist in the evaluation of bids. Determination of a bidder's qualification usually proceeds <br /> on two levels. From an objective standpoint, information can be gathered reflecting the contractor's previous <br /> experience, financial stability, equipment ownership, organization, etc. by requiring submission of qualification <br /> statements(such as AIA Document A305). Equally important, is an assessment of the contractor's workman- <br /> ship, efficiency, responsiveness, and other more subjective attributes. We have worked with many construction <br /> managers, general contractors, and subcontractors, and bring that experience to the table when qualifications <br /> are reviewed. <br /> S T . -' 4- f <br /> I S F - t � <br /> a +. s ' . ` k„ <br /> ` <br /> - ._ Du a s d isi L -- x y -' 3r'i t ✓ t t.5s s rr r , p_ .r tr.. 5, warp r � [ i :rest, �r kt r f 1 �H. t f i , <br /> ; I ��9 rgiiiir� i$ mom{ r i 1 jg <br /> 5jig�lC =a /i0 y��>`� �K t F 1i ' _ � r/.e <br /> •16 City of Sunny Isles Beach New Facility Qualifications rot Architectural Design Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.