My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Samson Oceanfront Park <br />City of Sunny Isles <br />Technical Specifications <br />CLEARING AND LAND PREPARATION 02110-2 <br /> <br />1.08 INSPECTION COORDINATION: <br /> <br /> The CONTRACTOR shall provide access to the WORK for the <br />ENGINEER as requested for inspection. The CONTRACTOR shall provide 48 hours notice of its intention to <br />begin new WORK activities. <br />1.09 <br /> <br />WARRANTY: (Not Used) <br />PART 2 - PRODUCTS (Not Applicable) <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 <br /> <br />GENERAL CLEARING: <br />A. The CONTRACTOR shall remove the majority of the above grade non-native vegetative matter in <br />the areas indicated on the plans. The CONTRACTOR shall complete the work of Clearing and <br />Land Preparation as outlined below. <br />1. All stumps shall be ground level to six inches below the surrounding ground level. Stumps on <br />the slopes shall be cut flush with the natural angle of the existing grade and treated <br />immediately with a herbicide approved by the ENGINEER. All seedlings within the project <br />site shall be treated with the herbicide. <br /> <br />2. All plant material (whole or chipped) will be removed from the project area and stockpiled at <br />a location authorized by the ENGINEER. Disposal of the stockpile shall be accomplished at a <br />maximum of every 15 workdays. <br /> <br />3. Remove any garbage or other waste debris recovered during clearing. <br /> <br />4. On completion of the clearing, remove all sticks, rubbish and other extraneous material and <br />rake the ground surface in order to leave a smooth and clean appearance. <br /> <br />5. Clearing and land preparation shall proceed sufficiently ahead of earthwork activities to <br />minimize disruption and allow time for determination of the adequacy of the clearing <br />procedure. <br /> <br />6. All work shall be performed in accordance with approved principles of modern arboricultural <br />methods. <br /> <br />7. All trees to remain in the project area, as designated by the ENGINEER, shall be protected <br />from damage by tree barricades. <br /> <br />8. All work shall be performed without damage to existing amenities, including trees and shrubs. <br /> The CONTRACTOR shall be responsible for repair and replacement of existing amenities to <br />the satisfaction of the ENGINEER. The CONTRACTOR shall protect all vegetation, habitats, <br />or amenities on the project location as indicated on the plans. <br /> <br />B. The CONTRACTOR shall clear adjacent to cut or fill sections to a minimum distance of 10 feet <br />outside of slope lines unless lesser distances are specified. Clearing in areas of native vegetation <br />for levee construction or removal and canal excavation shall be limited to a distance of 10 feet <br />outside of slope lines. <br /> <br />C. The CONTRACTOR may not burn cleared materials within the limits of the project. <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.