My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� -r <br /> • <br /> • <br /> o <br /> !`-.ARISOL MEDINA, GIS Technical Leader <br /> Water Distribution Optimization Project,Puerto Rico Aqueduct and Sewer Authority(PRASA)-An integrated <br /> approach to water distribution system optimization was developed to study high pressure in the system. <br /> Pressures are regulated to an optimum of 30-50 psi by PREPA.The purpose of the first phase of this project <br /> was to reduce pressures to this range in areas of high pressure. This project provided the information to <br /> appropriately regulate pressure in the systems and bring down water consumption, leakages and costs, <br /> provided validated models on H2OMAP Waterm,and set the stage for setting up digital data/control centers <br /> in the regions and central office. The second phase of this project involved the delineation of the sectors <br /> served by a single source of water supply(filtration plant or well).As a GIS Technical Leader she was in charge <br /> of creating standards to ensure a data transfer between the involved departments (Civil Water and GIS) <br /> including the collection of field data. She also determined the procedure to accomplish the project <br /> requirements,and coordinated the staff to meet deadlines deliveries and budget constraints. <br /> 411 <br /> • <br /> •♦♦♦ SECTION 3 • PAGE 169 <br /> COMM POOOIDONA7 maniaRA7&BialaIING=TWO RIM OM((Oil) <br /> CSA Group OH1usi 101 O1AIHUUONA NO.1244-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.