Laserfiche WebLink
Zir CITY OF SUNNY ISLES BEACH t-j* <br /> CONTOJUING PROFESSIONAL ARCHITECTURAL&ENGINEERING SFBVUZ FIRMS ONLY(CCNA) <br /> REQUEST FOR QUALIFICATIONS NO.12-04-02 <br /> SECTION - 4B . OVERALL ORGANIZATION <br /> Our overall organization to complete projects in this contract is shown in our Organization Chart included in <br /> Section 3A of this proposal. The chart includes the personnel available and planned for this contract. It is <br /> summarized as follows (years of experience in parenthesis): <br /> Mr. Juan Vazquez, PE, PH, BCEE (26) will be the project manager in charge of delivering and completion <br /> of tasks. He will be the main contact with the City. <br /> Mr. Robert Behar, PE (35) will be the Principal-In-Charge and will be an asset to this contract in terms of <br /> his overall experience and relations with agencies such as the FDOT. He is currently the president of the <br /> Florida Institute of Consulting Engineers. <br /> Mr. Javier Rodriguez, PE (25) will be in charge of quality control and assurance. He is currently serving <br /> as District Drainage Engineer for the Central Broward Control District. <br /> Mr. David Boyer, PE (26) will be the lead engineer for stormwater and drainage projects. <br /> Mr. David Romano, PE (16) will lead construction administration services and assist with cost estimating. <br /> • Mr. Jerry Piccolo, PE (33) will assist with any miscellaneous structural designs such as outfalls, seawall <br /> repairs, bridge design and evaluations. <br /> Roadway Design Items will be lead by Mr. Carlos Mazorra, PE (25). He is a former FDOT D6 employee <br /> and is current in all aspects of roadway, lighting, signing/markings, ADA, and traffic operations design. <br /> Surveying services will be lead by Selvin Bruce, PSM (33) from CSA (fka Consul-Tech). Mr. Bruce has <br /> over 33 years of experience in surveying and mapping. <br /> Mr. Hernando Ramos, PE (26) will be the geotechnical engineer on this contract for design of any <br /> structural items, pavements and drainage systems. <br /> We have also included in the team a GIS specialist to assist the City in case it desires those services. <br /> S <br /> ®Ig R.J.Behar SECTION 4 • PAGE 15 <br />