Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> COMM PROFESSIONAL AHIffiTECTURAL&EN61NLERING SERVIO3 FIRMS ONLY(COIN <br /> REQLO]TFOR QUALIFICATIONS NO.12.04-e2 ROBERT J. BEHAR, PE <br /> PRESIDENT/PRINCIPAL IN CHARGE <br /> ENGINEERING EXPERIENCE <br /> He began his engineering career in 1977 with the Florida Department of <br /> Transportation, and has over 35 years of experience in the planning, design and <br /> ^ management of transportation projects nationwide. He has worked on projects for <br /> �` 9 P Pl P1 <br /> many municipalities throughout South Florida. He has been very active member of <br /> various engineering societies where he has served as president of the South Florida <br /> Section and Miami-Dade Branch of the American Society of Civil Engineers, Chair of <br /> w ( the American Society of Civil Engineers Highway Division, Chair of Florida Institute of <br /> - — Consulting Engineers Transportation Production Committee, and member of the <br /> EDUCATION Transportation Research Board's Geometric Design Committee. Mr. Behar was <br /> - B. S. Civil Engineering, awarded the Ben Watts Partnership Award in 2010. <br /> University of Florida,1974 Projects at R. J. Behar& Company, Inc. and project history include: <br /> M. E. Civil Engineering, <br /> University of Florida,1975 RELEVANT EXPERIENCE <br /> NW 87th Avenue (SR•9731Galloway Road) Miami-Dade County, Florida - FDOT, <br /> PROFESSIONAL District 6(FM No. 405615.3.52.01) <br /> REGISTRATIONS Principal in Charge/ Project Manager for roadway design of new construction and <br /> P. E. Florida License reconstruction of NW 87th Avenue. The scope included the new construction and <br /> No. 21755/1980 reconstruction of NW 87th Avenue from NW 74th Street to NW 103rd Street in Medley, <br /> P. E. Kentucky License Florida. This project included roadway plans, drainage, traffic, lighting, signing and <br /> No. 19836/1997 marking, signalization and bridge plans. Project length: 1.90 miles± <br /> P. E. Indiana License SR-932/W/E 49th Street (NW 103rd Street from W. 2nd Avenue to E. 10th Avenue) <br /> ® No. 19800047/1997 Miami-Dade County, Florida- FDOT, District 6(FM No. 417914-1-52-01) <br /> P. E. Michigan License Quality Assurance/Officer in Charge-The scope included milling and resurfacing and <br /> No.6201043655/1997 ADA pedestrian ramp upgrade length: 1.576 miles. RJ Behar produced all the <br /> P. E. Ohio License roadway design plans, pavement marking and signing, lighting, drainage, utility <br /> No. E-6264 coordination and permitting. <br /> Andrews Avenue Improvement- FDOT, District 4 <br /> PROFESSIONAL SOCIETIES Project Manager for the new construction of Andrews Avenue from Atlantic Boulevard <br /> American Society of Civil to NW 15th Avenue - The project included roadway design, signal plans, signing and <br /> Engineers marking, lighting, bridge plans, and traffic studies. <br /> Florida Engineering Society Powerline Road (SR-845)-FDOT, District 4 <br /> Institute of Transportation Principal in Charge for the resurfacing (RRR) of 3 mile of urban roadway, including <br /> Engineers signal plans, lighting plans, marking and signing plans including signal plans, lighting <br /> Transportation Research Board plans, marking and signing plans. <br /> Southern Boulevard (SR-80) Improvements-FDOT, District 4 <br /> Project Manager/Principal in Charge for the design and preparation of construction <br /> YEARS OF EXPERIENCE documents for the reconstruction of a 2.5 mile urban roadway, including a major urban <br /> 35 Years interchange. The estimated construction cost is$ 18,000,000. <br /> SR-A1A Resurfacing (RRR)- FDOT, District 4 <br /> YEARS WITH RJ BEHAR Principal in Charge for the resurfacing plans for 5 miles of rural roadway from the <br /> 1999-Present Boynton Inlet to Lake Worth Road. <br /> Atlantic Avenue(SR-806) Palm Beach County, Florida-FDOT, District 4(FM No. <br /> 413841.1.32-01) <br /> Principal in Charge for the resurfacing (RRR) of a 3 miles roadway section from Via <br /> Flora to Congress Avenue. <br /> Alton Road (SR-907)-FDOT, District 6 <br /> ® <br /> Project manager for the resurfacing (RRR) of 3.9-mile of urban roadway, including <br /> major drainage improvements,signal plans, lighting plans, marking and signing plans. <br /> R.J.Behar SECTION 3 • PAGE 110 <br />