Laserfiche WebLink
ROBERT J. BEHAR, PE <br /> SITE DESIGN EXPERIENCE <br /> Seawall Repairs—City of Pompano Beach, Florida <br /> ® Principal in Charge for design and permitting of repairs to seawalls and site improvements at Hillsboro Inlet Park. <br /> Hialeah Public Works Site Plan—City of Hialeah, Florida <br /> Principal in Charge— The project included site redevelopment and drainage improvements associated with the construction <br /> of the new Hialeah Public Works Complex. <br /> Devine Park—Town of Davie, Florida <br /> Principal in Charge—The Town of Davie contracted RJ Behar to convert a portion of the Devine Estates Tree Nursery into <br /> an equestrian park. <br /> Police Station Parking Lot—City of Hialeah, Florida <br /> Project Manager/Engineer of Record for plans, contract documents, permitting, utility coordination and contract <br /> specifications. Paving, grading and drainage plans for a parking lot in the City of Hialeah. Project included French drains <br /> for water quality,and water and sewer connections. <br /> J.F.K. Library Parking Lot—City of Hialeah, Florida <br /> Project Manager/Engineer of Record for plans, contract documents, permitting, utility coordination and contract <br /> specifications. Paving, grading and drainage plans for a parking lot in the City of Hialeah. Project included French drains <br /> for water quality and water and sewer connections. <br /> Hialeah High School Parking Garage•Civil Plans—City of Hialeah, Florida <br /> Principal in Charge/Project Manager for civil site improvements for this parking garage within the City of Hialeah. <br /> Tiger Tail South Side of Lake Parking - Broward Community College—Broward County, Florida <br /> Principal in Charge to provide engineering design for the development of a 2-acre recreational facility parking addition in <br /> Broward County, Florida. <br /> Coral Springs Aquatic Complex Parking Lot—City of Coral Springs, Florida <br /> Principal in Charge to provide engineering design services for the addition of parking spaces at the Coral Springs Aquatic <br /> Center located at 12441 Royal Palm Boulevard within the City of Coral Springs. <br /> Sunrise Athletic Complex, Additional Parking—City of Sunrise, Florida <br /> ® Principal in Charge to provide engineering design services for the addition of parking spaces at the Sunrise Athletic <br /> Complex within the City of Sunrise. <br /> BC& FAU A. Hugh Adams Parking Garage—Davie, Florida <br /> The scope of this project consists of civil engineering services for the design-build team for a 5 story 1000 vehicle parking <br /> garage located in the Broward College Davie campus. <br /> BC Central Campus Building #6—Davie, Florida <br /> The scope of this project consists of civil engineering services for the addition building#6 at BCC. <br /> ENVIRONMENTAL ENGINEERING/UTILITY DESIGN/PD&E'S <br /> Project Development and Environment (PD&E) Study for SR-8741Don Shula Expressway Ramp Connector to SW <br /> 136'"Street— MDX(Metric Engineering, Inc) <br /> Principal in Charge for the required traffic engineering analysis and the development of major documents, such as the <br /> Interchange Modification Report and the Design Traffic Technical Memorandum. The study consists of the preparation of <br /> the PD&E traffic report, for the SR-874/Don Shula Expressway Ramp Connector to SW 136t Street. The study assesses <br /> existing and future traffic operations of the interchange,given a No-Build scenario, and up to four Build scenarios. <br /> Project Development and Environment (PD&E) Study for SR-80 (Southern Boulevard) Improvements, Palm Beach <br /> County, Florida—FDOT, District 4(C3TS) <br /> Principal in Charge for the Preparation of the Contamination Screening Report and Access Management Report. A <br /> Contamination Screening Evaluation Report was conducted to determine potential adverse effects associated with the <br /> widening of SR-80 in accordance with the FDOT Project Development and Environment(PD&E) Manual Volume 2, Chapter <br /> 22. The report identifies and evaluates the presence of known or potential contamination, presents recommendations, and <br /> discusses possible impacts to the proposed project Contamination Screening Evaluation Report. Project length: 8.7 miles. <br /> MUNICIPAL EXPERIENCE <br /> Miami River Greenways, Segment D—City of Miami, Florida <br /> Principal in Charge — The project consists of the reconstruction of an existing roadway segment along the Miami River to <br /> ® <br /> produce a scenic, landscaped, pedestrian/bicycle walkway/greenway. The project includes the design of a drainage system <br /> with wells,decorative lighting and landscape/bardscape design. <br /> ® II R.J.Behar CONTLNENG POOTB5ONAL AICTBTTOAL 6 EIQL\2LNG Salim RIM ONaY mu SECTION 3 • PAGE 111 <br /> i f` OEOEFTT FOO OOAIllICATIONI NO.12-04-02 <br />