Laserfiche WebLink
ROBERT J. BEHAR, PE <br /> Davie Road Beautification Streetscape Project—Town of Davie, Florida <br /> Principal in Charge for the Downtown Davie streetscape beautification design/build project. The project consisted of street <br /> resurfacing, new lighting sidewalk replacement. <br /> Town of Davie Local Agency Program(LAP)Certification—Town of Davie, Florida <br /> Principal in Charge—RJ Behar assisted the Town of Davie in obtaining FDOT certification for Local Agency Program (LAP) <br /> funding of town capital projects. <br /> NW 440 Street—City of Lauderdale Lakes, Florida <br /> Project Manager—The project included the design and construction management of new construction for approximately 0.5 <br /> mile. The scope of services included drainage plans, marking and signing plans and lighting plans. <br /> NW/NE 13th Streetscape—City of Fort Lauderdale, Florida <br /> Project Manager - Master Plan and Public Involvement for a 2.1 mile roadway, in Fort Lauderdale including resurfacing <br /> plans,marking and signing plans, landscape plans and roundabout design. <br /> NE 15th Avenue Streetscape—City of Fort Lauderdale, Florida <br /> Project Manager — The project included master plan and public Involvement for a 1.0 mile roadway, in Fort Lauderdale. <br /> Resurfacing plans, marking and signing plans, landscape plans. <br /> Citywide Resurfacing Project—City of Tamarac, Florida <br /> Services include roadway and landscape plans for 19 miles of City streets throughout the City of Tamarac. <br /> Palm Avenue Final Design (From Okeechobee Road to 21st Street)—City of Hialeah, Florida <br /> Project Manager/Engineer of Record — The project included streetscape roadway plans, marking and signing plans, <br /> roundabout design, and signalization plans for 6 intersections. The project consisted of converting Palm Avenue from a one <br /> way to a two way street. <br /> East 1st Avenue to E. 2nd Avenue Between E. 16th& E. 20th Street- Design Study—City of Hialeah, Florida <br /> Project Manager/Engineer of Record for roadway plans,signalization plans, utility relocation plans as well as the design and <br /> drafting of signing and marking plans, traffic study, and lighting plans including lighting calculations for the reconstruction of <br /> East 1st Avenue from 1-way to a 2-way street in the City of Hialeah. The project also included neighborhood street <br /> improvement, new pavement and drainage and new sidewalks. <br /> ® West 290 Street Improvements—City of Hialeah, Florida- LAP/ARRA Project <br /> Project Manager/Principal in Charge to provide roadway improvements on West 29th Street from West Okeechobee Road to <br /> West 4th Avenue within the City of Hialeah. The scope of this project consisted of sidewalk,curb and gutter replacement and <br /> patching,driveway replacement and patching, manhole and inlet cleaning, inlets and valve box adjustments, replacement of <br /> inlet tops, removal and installation of single post signs. This project was part of the American Recovery and Reinvestment <br /> Act, which was supported by federal funds. One of the challenges on this project was to prepare roadway plans which <br /> would improve the roadway corridor while minimizing the federal funds the City would have to use. The project consisted of <br /> extensive field work in order to locate roadway deficiencies.ADA improvements, curb, driveway and sidewalk repairs, utility <br /> locations and roadway repairs were some of the aspects documented for this project. <br /> Review of Roundabout Design for SW 61st Avenue and SW 38th Court—Town of Davie, Florida <br /> Principal in Charge — RJ Behar was contracted by the Town of Davie to provide traffic engineering services. Under this <br /> contract we were asked to evaluate the existing geometry of the roundabout at the intersection of SW 61st Avenue and SW <br /> 38ih Court. <br /> SE 15th Street, South Miami Road, SE 10th Avenue Intersection Improvements—City of Fort Lauderdale, Florida <br /> Principal in Charge — RJ Behar has been contacted by the City of Fort Lauderdale to provide engineering design services <br /> for the intersection improvements of SE 15th Street with Miami Road and SE 10th Avenue in Fort Lauderdale. <br /> DRAINAGE IMPROVEMENT/STORMWATER MANAGEMENT/STORMWATER MASTER PLANS EXPERIENCE <br /> Driftwood Neighborhood Street and Drainage Improvements—Town of Davie, Florida <br /> Principal in Charge-The project consisted of site improvements and drainage improvements. <br /> Stormwater Master Plan—City of Hialeah, Florida <br /> Project Manager for the City's stormwater master plan- He coordinated with SFWMD, City of Hialeah and client. <br /> Bucky Dent Park Drainage Analysis and Design—City of Hialeah, Florida <br /> Project Manager - The services included an alternatives analysis report to resolve the park's drainage problems. Three <br /> alternatives were proposed including cost estimates for each. <br /> 40 <br /> ®�II R.J.Behar (py�ryp6P60IBUONLLA &EiQL1'FQnictarns ITIM1011Y(COW SECTION 3 • PAGE 12 <br /> RMMER FOR OLRInaBONI NO.12-04-02 <br />