Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> CONTINUING PROFESSIONAL ARCHITECTURAL&ENQUIRING SERVICES FIRMS ONLY(LTXAS <br /> REQUEST FOR QUAI1JICATIONS NO.1244.02 <br /> DAVID M. BOYER, PE <br /> ® <br /> ENVIRONMENTAL /DRAINAGE/PERMITTING <br /> � " � �` T ENGINEERING EXPERIENCE <br /> iri <br /> /� Mr. Boyer has over 25 years of experience including expertise in stormwater <br /> ��'r, management and treatment system design, highway, municipal and private <br /> .. drainage design, and project management. He also has an extensive <br /> -.1 -1) <br /> 'p '++ -42: r--011#41 <br /> r If ) background in roadway drainage design and permitting projects for the Florida <br /> i ' '.I ��, 1 Department of Transportation (FDOT) on multiple Interstate and Turnpike <br /> i ' roadway widenings. Mr. Boyer has experience in the drainage design on <br /> L ' ' j several airport projects, such as the Miami International Airport and the Fort <br /> Lauderdale-Hollywood International Airport. At RJ Behar, he is the Director of <br /> Water Resources. <br /> RELEVANT EXPERIENCE <br /> --- ., SR-836 Emergency Access Ramp, Miami-Dade County, Florida - Miami- <br /> Dade Expressway Authority(MDX) <br /> EDUCATION Drainage Engineer of Record - All the associated drainage design, <br /> B.S. in Environmental Engineering environmental permitting and utility coordination are a part of this project. The <br /> University of South Florida project consists of creating a single lane ramp that connects the Florida <br /> Tampa, Florida, April 1985 Turnpike on-ramp to the westbound SR- 836 extension for emergency use only. <br /> PROFESSIONAL REGISTRATIONS The emergency ramp was requested by the Miami-Dade Fire Rescue <br /> Department to reduce their response time to emergencies along the SR-836 <br /> P. E. Florida License extension and locations where using the SR-836 extension would be the most <br /> No.43226, 1990 direct route. This design is considered'complex-highway"and will be part of the <br /> ® P.E.Washington License MDX system. An emergency u-tum will be designed on the SR-836 Extension <br /> No. 34591/1997 between SW 127th Avenue and SW 1370,Avenue. Project length: 1 mile <br /> NW 7th/9th Avenue Connector(Design)-City of Fort Lauderdale, Florida <br /> PROFESSIONAL AFFILIATIONS Lead Drainage Engineer - He is responsible for the urban drainage design, <br /> Member of Florida Engineering storm sewers, stormwater quality treatment, and permitting, The project <br /> Society includes the roadway design of an urban section, 4-lane divided connector <br /> National Society of Professional between NW 7" and NW 90, Avenues. The scope of this project includes <br /> Engineers signalization, drainage design, signing pavement marking and permitting as <br /> American Society of Civil well as public involvement coordination. <br /> Engineers Project length: 1.5 miles <br /> SR-8361Auxiliary Lanes PD&E Study, Miami-Dade County, Florida - <br /> (Subconsultant to: EAC consulting, Inc.) <br /> YEARS OF EXPERIENCE Drainage Engineer-He oversaw preparation of the conceptual drainage report <br /> 25 Years Project length: 5 miles <br /> SR-16 Developer Project-Jacksonville, Florida <br /> YEARS WITH RJ BEHAR Senior Drainage Engineer on this developer project that involved providing dry <br /> 2009-Present detention and dry retention can meet SJRWMD criteria and FDOT District 3 <br /> criteria at the same time. He saved over $9 million by not having to obtain <br /> right-of-way for a wet detention pond. He was responsible for rural roadway <br /> drainage, cross drain design, and analysis of two bridge class culvert widenings <br /> along with stormwater permitting. <br /> Parsons Avenue Reconstruction-City of Tampa, Florida <br /> Drainage Engineer - He redesigned a one acre retention/percolation basin <br /> used for roadway runoff treatment and attenuation. <br /> II <br /> 01 R.J.Behar SECTION 3 - PAGE 115 <br />