Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> - <br /> �.. .. ..,..... . . <br /> COMM PROFUSION ABOTEETERAL&ENMESH%SERVICE FIRMS NS(Cant <br /> RIVET FOR QUALIFICATIONS NO.12-0402 <br /> ® RAFAELURDANETA, CCM <br /> CONSTRUCTION PROJECT MANAGEMENT <br /> _4. ,d 1ENGINEERING EXPERIENCE <br /> -: . - a Mr. Urdaneta has over 23 years of experience in civil engineering design and <br /> tF' construction management projects. He is very knowledgeable in public and <br /> //,, { �� private work projects including buildings,wastewater facilities, roadways, utilities, <br /> i = 1 stormwater and drainage systems, water distribution, malls, high rise buildings, <br /> wpetroleum platforms, subdivisions and medical centers as well as hydrologic and <br /> _ N: hydraulic modeling related to land development projects. <br /> I <br /> Mr. Urdaneta's experience also includes permitting procedures in entities such <br /> EDUCATION as the South Florida Water Management District, Broward County, City of <br /> B. S. Engineering. Universidad Rafael Sunrise, City of North Miami Beach, City of Coconut Creek, City of Fort <br /> B. S. Civileta VenezuelaEginri 1987 Lauderdale, City of Pembroke Pines, Town of Davie and the City of Austin, <br /> Texas. <br /> PROFESSIONAL REGISTRATIONS <br /> P. E.Venezuela RELEVANT EXPERIENCE <br /> Florida Certified Construction Manager W. 53" Street (from W. 12th Avenue to W. 16"' Avenue) Construction <br /> Engineering Inspection — City of Hialeah, Florida; American Recovery & <br /> CTQP # U63573061 Reinvestment Act <br /> Project Administrator responsible for the West 53rd Street ARRA-Funded <br /> LICENSES & CERTIFICATIONS reconstruction projects within the City of Hialeah. The general overview and <br /> CTQP Final Estimates Level I &II scope for this project comprised the complete reconstruction of West 53rd Street <br /> ® ., CTQP Asphalt Paving Level I & II (from W. 12th Avenue to W. 16th Avenue) including new sidewalk, curb and <br /> CTQP QC Manager gutter, drainage improvements - new drainage inlets,18" storm sewer cross <br /> , ACI—Concrete Field Testing Technician drainage pipe, 18" exfiltration trench (French drain). Proposed in the project <br /> Grade I scope are pavement milling and resurfacing, signing and pavement markings <br /> • ATSSA Florida Advanced Work Zone and grading of the adjacent swale areas and sod restoration with Performance <br /> - IMSA Traffic Signal Technician Level 1 Turf. Project length: 0.5 miles <br /> • Nuclear Gauge Safety Training & Okeechobee Boulevard (SR-714) Construction Engineering Inspection — <br /> Hazmat Training Palm Beach County, Florida <br /> OSHA 10-Hour Construction Health & Project Administrator — He is responsible for overseeing the roadway <br /> Safety Course construction improvements on Okeechobee Boulevard. The typical section <br /> OSHA Excavation and Safety Certified consists of a 6-lane urban divided arterial with curb and gutter approaching the <br /> Construction Business Mgmt. CSX/Tri-Rail at-grade gated crossing. Signal and crossing gates will be installed <br /> FDEP Stormwater Mgmt. Inspector by CSX's Railroad contractor and coordinated with the County's roadway <br /> Earthwork Const. Inspection Level I approach and joint signal installations. <br /> FDOT Training Program: EEO, DBE and I.75/Pines Boulevard Bridge Deck Repair, City of Pembroke Pines, Florida— <br /> Payroll Compliance on Local Area Proj. FDOT District 4 <br /> FDOT 8-Hour LAP Workshop Project Administrator/Senior Inspector—Inspector responsible for overseeing the <br /> FDOT Critical Structures Construction demolition and reconstruction of the concrete bridge deck on Pines Boulevard <br /> Issues (SR-820) over the 1-75 (SR-93) Interchange within the City of Pembroke Pines. <br /> • U.S.ACOE 16-Hours CO Mgmt. for The improvements under this contract consist of the removal and demolition of <br /> Contractor the existing concrete bridge deck to a depth of 3.5 inches, or % inch below the <br /> • Planting and Establishment with Grades top mat of reinforcing steel, sandblasting, check for steel deterioration, and re- <br /> & Standards Training install/splice new reinforcing steel as necessary; and final placement, casting, <br /> YEARS OF EXPERIENCE and curing of the new concrete overlay deck. Project length: 0.2 miles. <br /> ® 23 Years <br /> YEARS WITH RJ BEHAR <br /> 2004 -'Present <br /> NER.J.Behar SECTION 3 - PAGE 155 <br />