My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMC Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
DMC Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 1:59:21 PM
Creation date
2/2/2016 1:59:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT EXPERIENCE (CONT'D) <br /> Surfside Estates, Beverly Beach, FL — Senior Project Engineer. Responsible for all engineering, <br /> design, permitting with City and FDOT on roadway entry redesign, plans, specifications and on-going <br /> construction inspection. <br /> Halifax Harbor Marina North & South Basin Dredging, Daytona Beach, FL — Project Engineer. <br /> Assisted with upland disposal site drainage and containment issues. Verified material behavior and <br /> property assessment. <br /> Home Depot Stormwater Improvements, Palatka, FL — Sr. Project Engineer. Responsible for design <br /> of 100 feet of spreader swale and 10 feet high concrete retaining wall for stormwater pond <br /> improvements. Project included coordination with St. Johns River Water Management District for permit <br /> modification. <br /> City of Port Orange Parks & Public Shoreline Protection, Port Orange, FL — Project <br /> Engineer/Engineer of record. Responsible for design of re-armoring 225 linear feet of cap stone and <br /> 215 feet of rock revetment for Causeway Park and avoiding shoreline and wetland impacts. Project <br /> included bidding, construction administration, inspection and project closeout. Coordinated all design <br /> work with FOOT and SJRWMD to meet its requirements. Provided all documentation to acquire lease <br /> agreement with City (client) and FDOT to use its right-of-way. Project included the B-23 Canal and <br /> right-of-ways. <br /> Port Orange Causeway Park Shoreline Stabilization, Port Orange, FL — Project Engineer - <br /> Responsible for design of re-armoring 225 linear feet of cap stone and 215 feet of rock revetment for <br /> Causeway Park, ensuring new structures will not impede existing stormwater and surface drainage. <br /> Project included bidding, construction administration, inspection and project closeout. Provide QA/QC <br /> for project design, coordination with FDOT for right-of-away use. <br /> Russell Property ADA Compliant Canoe & Kayak Launching Facility, Port Orange, FL — Project <br /> Engineering/ Engineer of Record. Ensured all design work conformed to FDEP rules for construction of <br /> piers over and in Outstanding Florida Waters . Provided all documentation to acquire lease agreement <br /> with City (client) and FDOT to use its right-of-way. <br /> Taylor Creek Restoration Dredging, Phase 2, St. Lucie County, FL — Project Engineer. Evaluated <br /> seven potential upland disposal areas. Designed a new 20 acre disposal area to contain 90,000+ cubic <br /> yards of dredge spoil. Engineer of record for site survey coordination, monitoring well installation and <br /> compliance, geotechnical drilling, soils analyses and final berm cross-section and design, including <br /> stormwater management of the site. <br /> Taylor Creek Restoration Shoreline Dredging, Phase 3, St. Lucie County, FL — Engineer of <br /> Record. Reviewed design of the rock revetment structure along 2, 000+ linear foot of shoreline along <br /> the C-25 Canal (Taylor Creek). <br /> Aesop's Park-Dog Park and Park Improvements, Tavares, FL — Project Engineer. Responsible for <br /> engineering, permitting, and all bid drawings and specifications for the design of dog park, pavilion, <br /> waterline and resource impact minimization of associated facilities. Reviewed quotes for contractors to <br /> make recommendations to City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.