Laserfiche WebLink
S <br /> ® City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> ® nodes of intensity at various points along the corridor) set the stage for more <br /> ® transit-friendly, sustainable development. <br /> ® Corradino is adept at the development of master plans. These plans have been <br /> ® completed for Miami Beach, the Miami Dade Coastal Communities, Miami <br /> ® Gardens, Doral, Palmetto Bay, Cutler Bay and many others. Master planning is an <br /> exercise in quality data collection, technical analysis, project development, project <br /> evaluation and prioritization as well as public involvement. Master plans first need <br /> ® to understand the community's wants. It is important to know what is desired. <br /> ® Through an analysis of existing and future conditions, a determination of needs can <br /> be attained. The complex part is: melding the wants and- the needs to build <br /> ® consensus on a program of projects that would be acceptable to the community, <br /> ® while mitigating future,impacts. Once a program of acceptable projects is listed, <br /> • they must be explained in'terms of costs to plan, design, and construct. Then they <br /> must be evaluated so those that meet the community criteria, are prioritized <br /> highest. Corradino likes la-develop implementation schedules with its master plans <br /> ® so that local governments understand the path for each project by identifying <br /> funding sources, appropriate permitting, and approval agencies, as well as <br /> implementation time frames. <br /> ® Parking Studies <br /> ® Corradino has-Worked with parking for many of its municipalities. Recently the <br /> firm completed a parking generation forecast for the:feasibility of a municipal <br /> ® parking garage and trcinsit transfer center in Palmetto Bay. For Miami Beach <br /> ® they performed they Intermodal Feasibility Study, -where ,they examined the <br /> • <br /> location, cost and parking generation of a municipal intermodal center. Also <br /> for Miami Beach the firm performed the one of the largest parking studies in the <br /> region, inventorying and analyzing all public parking in the city. This was a <br /> ® monumental data collection and arialysis effort. Corradino performed manual <br /> ® occupancy counts at least three times per day during the week and weekend <br /> ® for every public parking space, on street and off street, and then worked to <br /> develop parking policy for this critical infrastructure. Corradino has designed <br /> ® parking as well as estimated the cost to develop facilities. <br /> ® Roadway Design <br /> ® Corradino has successfully completed roadway design and drainage projects <br /> ® for cites in Miami-Dade County and across the nation for 40 years. The firm <br /> ® provides highway design in three functional areas: project development, <br /> �►nnn A ntwlr <br /> 411 VVn nfA V 11 \ V <br />