My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> functional plans, and functional construction drawings. The firm's extensive <br /> experience in highway design ranges from complex interchange configuration <br /> ® development and design, to local streetscape projects. Corradino staff expertly <br /> 0 handles projects where issues of constrained right-of-way and permit issuance <br /> present major challenges. <br /> • Project Programming <br /> ® As a result of the firm's master planning experience, MPO experience, as well as <br /> ® its PD&E experienced, Corradino understands how to move a transportation <br /> ® concept through the process to implementation, including what studies are <br /> ® needed, and when to insert a project on to the Long Range Transportation Plan, <br /> and TIP. We also understand the agencies involved and technical reviews <br /> ® required. , <br /> 0 <br /> ® SCHEDULE OF PROPOSED SERVICES <br /> ® Corradino understands that the City of Sunny Isles Beach is seeking consultants in <br /> multiple categories so serve as General Services Consultants. These consultants <br /> ® would be pre-selected- and available to work on individual `contracts or work <br /> 0 orders that the-City needs on an as needed basis. The benefits of selecting a <br /> ® pool of consultants is the ability to implement plans, studies, or designs more <br /> quickly than undergoing the full CCNA process each time an individual project is <br /> bid. Typically, individual projects desired by the City are scopedfand provided to <br /> 0the selected pool of consultants. The consultants bid,‘and one is selected in an <br /> ® expedited process. A work order is issued to that'`eonsultant and work begins as <br /> ® per the work orders' price, scope, and timeframe. <br /> ® With a million people visiting this geographically small city each year, the effort to <br /> ® preserve quality of life must be constantly attended to. Since incorporation, <br /> ® Sunny Isles Beach has done an excellent job of developing a high quality <br /> environment. What was once a sleepy seaside area with low-rise motels past <br /> ® their prime has become "Florida's Riviera." The City has attained worldwide <br /> ® prominence, vibrancy, diversity, excellent local governance and architecturally <br /> ® stunning buildings. Sunny Isles Beach is an extremely desirable location in which <br /> ® to live, work, and play with its unparalleled amenities. <br /> ® ^ivct�AAvii i 2-11 <br /> S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.