My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> • and streetscape projects for many municipalities, including Miami, Hialeah, <br /> • Palmetto Bay and Miami Beach. The Construction Engineering and Inspection <br /> • (CEI) division of the firm has also worked mega projects, such as the <br /> • reconstruction of 1-95 in Palm Beach County, which was recently completed. <br /> • <br /> ® The Corradino team's approach to transportation engineering is fundamentally <br /> • based on a keen awareness of the complex technical issues unique to each <br /> • project, the establishment of the management processes necessary to address <br /> the issues, and the right staff to accomplish the project goals successfully. An <br /> ® experienced and knowledgeable CEI team is essential in order to maintain the <br /> • project schedule, realize potential cost reductions; minimize construction <br /> impacts, and gain public support. The construction management approach will <br /> • maintain excellent construction documentation, and provide contract <br /> • administration services including scheduleanalysis, estimating, construction <br /> • submittals review coordination, change order administration, and any related <br /> • project controls. ;The firm -has a detailed understand of FDOT's Local Agency <br /> • Program (LAP). - <br /> • - <br /> • Once a project is identified and assigned to Corradino, the team will develop <br /> ® an all-inclusive, project-specific Project Management Plan (PMP). The PMP is <br /> ® developed as a.project "guide book" for the contract administration functions, <br /> • and is therefore critical to the success of the project. The PMP identifies key staff <br /> and their roles and responsibilities, documents contract deliverables and their <br /> ® scheduled completion dates, and delineates the process fot Quality Control <br /> • and Quality Assurance: clt also describes management, cost control, cash flow, <br /> • schedule tracking and. invoice procedures, dr>•ocumentation, filing, project <br /> • communication ands-reporting procedures. The-PMP will be reviewed and <br /> • updated quarterly to reflect current activities and requirements. <br /> • <br /> Expertise in Traffic Engineering, Panning, Design, <br /> • etc. <br /> •• Corradino plans for mobility by understanding that each mode of transportation <br /> can play a significant role within the community. Corradino's Traffic and <br /> Transportation Planning services include: <br /> • <br /> • . Impact and LOS Analyses <br /> • . Transit <br /> ® . Bicycle/Pedestrian <br /> • . Master Planning <br /> ® moo A num tart 2-3 <br /> VVf1 FA LsrI III �./ <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.