F.J. "PACO" AMRAM, P.E., LEED AP <br /> .. Page 3 <br /> with all applicable regulations. The 8-month project was executed on a time <br /> and materials basis approximately 20 percent below the purchase order limit. <br /> Project Manager; BMP for Stockpile and Use of Combustion Fly Ash and <br /> Dredge Materials, Florida Crushed Stone (FCS)—Prepared a BMP plan to <br /> be used by FCS for their recycling of industrial dredge and fly ash by-product <br /> materials obtained from a regional coal-burning power plant. Obtained by- <br /> product data and inspected the facility and operations in Brooksville. Florida. <br /> Devised suitable control options acceptable to the client. Per 40 CFR Chapter <br /> 1-Part 122.2. the BMP plan specified the engineering controls, prohibitions. <br /> and O&M procedures to control runoff, spillage, and drainage from the raw <br /> material storage and transfer to the cement production operations. <br /> ' Project Manager/Senior Engineer; Emergency Response Cleanup, <br /> Assessment and Closure, Ballast Nedam Construction—In response to a <br /> release from the client's portable deisel fuel tank. performed preliminary <br /> ' assessment activities and directed onsite soil removal action at a facility in <br /> Florida. Interacted with the regulatory agency and with the neighboring <br /> resident who uses an onsite well for water supply and whose property was <br /> visibly impacted. Excavation was directed with extreme care due to multiple <br /> subsurface utiltities. including a water main. multiple fiber optic conduits. and <br /> unprotected phone/cable lines. A high-tension power line pole limited <br /> excavation depth to about 8 ft. Impacts were visible at that depth but could not <br /> 1 be excavated. Expedited agency approval to inject peroxide into this zone and <br /> then petroleum degrading bacteria into the backfill. The followup assessment <br /> was completed. No diesel contamination was detected in groundwater. <br /> Benzo(a)pyrene. other PAH compounds, and EDB were detected above <br /> standards. However. ECT successully demonstrated that these residual impacts <br /> in soil and the EDB in water were not attributable to the recent diesel fuel <br /> release. A No Further Action/Site Rehabilitation Completion Order was <br /> approved. No adjacent owner damage claims were made and no utilities were <br /> damaged. <br /> Project Manager; Interim RAP, Confidential Client—Designed in-situ/ex- <br /> situ remediation of chlorinated solvent and acetone plume in central Florida. <br /> The acetone remediation included aeration and it-situ recirculation for <br /> biodegradation. due to the costs and difficulty of removing highly soluble <br /> acetone from groundwater. <br /> Project Manager; Interim RAP, Confidential Client—Designed <br /> ' remediation of chlorinated solvent plume near municipal well field in central <br /> Florida. Used 2-dimensional models to estimate groundwater recovery and <br /> infiltration rates for this system combining groundwater pumping and multi- <br /> phase extraction. <br /> Project Manager; Fuel System Compliance Management, Confidential <br /> Client—Provided compliance management to central Florida client with nu- <br /> 1 merous problems. Reviewed notices of violations received from the regulatory <br /> agency by the owner of multiple fuel station properties in Pinellas County. <br /> Florida. Evaluated available data and determined compliance options and costs <br /> to cure. Attended annual compliance inspections and incident investigations <br /> 1 with agency personnel. Reviewed/summarized information about previous re- <br /> leases eligible for State cleanup funding. Negotiated with the regulatory agen- <br /> cy on behalf of the owner and thus eliminated significant fines. <br /> 1 <br /> rmtm'"d°ar CarmEa a Technology.ht. wawt.YkNI E Y"F SUNNY tsusnrveNoIcEsnstnA.st.noc-041o1 <br />