Laserfiche WebLink
II <br /> MONTICELLO PINES PUD AND PHASE I FINAL DEVELOPMENT PLAN <br /> I FOR MONTICELLO PLANTATIONS, LLC <br /> I HIGHLIGHTS: <br /> ■ Site master planning for a 421-acre PUD ■ Traditional Design concepts <br /> • Phase I FDP for 115 acres with 133 ■ Civil engineering design for grading, <br /> Traditional <br /> residential lots paving, stormwater management, water <br /> • Traditional Neighborhood Design concepts supply, and sanitary sewer <br /> ■ Sanitary Sewer Lift Station and Force Main • All roadways and underground utilities <br /> _ • 20.5 acres of parks/green space to be conveyed to the City of Monticello <br /> ECT is providing civil engineering planning, design, and permitting services for a new 421-acre <br /> I planned unit development (PUD), and final engineering design services for a 133-unit initial phase Fi- <br /> nal Development Plan (FDP) on 115 acres of the PUD. <br /> I. Technical features of this project include the •- • e <br /> following: '1-17....S.±.....,..=.-- l4-{ _._._ <br /> • A phasing plan designating land uses - _ --- --,...."..-=7.= <br /> I for all phases of development f <br /> ifi <br /> throughout the 421-acre PUD. f <br /> • 14,300 linear ft of roadways with wa- } ' o — <br /> Iter, sewer, and drainage utilities in `4 <br /> Phase I. -_� <br /> I .I <br /> 3,200 linear ft of paved alleys with _ \ �';`O it <br /> drainage utilities. t <br /> • 8 acres of park spaces and 12.5 acres ---" ' q '\' ,: .__ <br /> I of additional landscaped areas. - o <br /> , � <br /> • A 71-lot Traditional Neighborhood .- o = <br /> Design project "core" area adjacent - +.; ' <br /> to park spaces, using reduced build- 4';�� - - <br /> ing setback lines and alley-accessed -o _parking to facilitate a walkable -. . =--- <br /> I streetscape, and variable lot widths <br /> to accommodate diversity of housing products. <br /> • Gravity sanitary sewer mains throughout the project, and a duplex sanitary sewer lift station and <br /> I 3,475 linear feet of sanitary sewer forcemain to serve 97 residential units within the northern <br /> portion of Phase I. <br /> • Six wet detention stormwater management facilities and one bioretention basin to provide water <br /> Iquality treatment and peak attenuation. <br /> • 5,100 linear feet of walking/cycling trails. <br /> • A network of bypass swales, inlets and drainage pipes for interception and conveyance of <br /> Istormwater runoff around the project area from 33-acres of offsite discharge areas. <br /> • FDOT right-of-way access connection permitting. <br /> 1 The project is currently approximately 95% final design. All of the required agency permits have been <br /> issued with the exception of FDEP sanitary sewer main extension, for which civil design is complete <br /> and client authorization of electrical engineer for I&C design is pending. <br /> z %PROJECT PROFILE O <br /> ICAUSEASIYA.NGAPPDATALLOCALLWCRUSOFTWI\DOWSIIEMPORARY ISTER.N•Er FUF.SCUYIENT OVROOMOZNSG7QXISU\'ISL-PROI.DOC-043012 <br />