My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I "lir I Civil/Environmental Engineering <br /> V RFQ#12-04-02 <br /> I • Identify and photograph significant areas of environmental concern (and determine GPS <br /> locations of site). <br /> I .• Identify recognized environmental conditions. <br /> Determine need for Phase II. <br /> • Prepare Phase I report. <br /> IIf a Phase II ESA is necessary: <br /> • Designate task staff. <br /> I • Prepare work plan. <br /> • Negotiate and obtain approval of City for budget and schedule. <br /> • Prepare health and safety plan. <br /> • Determine number of monitoring wells and soil borings or other action (e.g., soil sam- <br /> pling). <br /> • Determine applicable laboratory analyses. <br /> • Conduct monitoring well drilling and/or soil boring advancement. <br /> • Collect soil samples for infield organic vapor measurements. <br /> • Measure groundwater level elevations. <br /> • Collect groundwater and/or soil samples for laboratory analyses. <br /> • Collect surface water samples, if applicable. <br /> I . Interpret field and laboratory analytical data. <br /> • Prepare Phase II report. <br /> I Contamination Assessment/Remedial Action Task <br /> • Receipt of task order. <br /> • Selection of task managers. <br /> I • Site review, development of work plan and cost estimates.Work plan may include: <br /> o Geohydrological studies of soil and groundwater. <br /> o Conduct initial remedial action, if necessary. <br /> I <br /> o Prepare an assessment plan. <br /> o Conduct contamination assessment—drilling, sampling, lab analysis. <br /> o Prepare assessment report. <br /> Io Evaluate control alternatives. <br /> o Prepare construction drawings. <br /> I o Develop remedial action plan (RAP). <br /> o Provide construction supervision. <br /> o Acquire permits. <br /> I <br /> o <br /> o Secure site access. <br /> Conduct risk assessment, if necessary. <br /> o Perform site monitoring. <br /> I o Dispose of contaminated material. <br /> o Prepare and submit quarterly and annual progress reports. <br /> • Task initiation upon approval by City of work plan and budget. <br /> I . Maintenance of communications with City during active work phases. <br /> • Completion of project task within scope (budget and schedule). <br /> I _ <br /> Ernefroniateglal 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.