Laserfiche WebLink
JOHN P. Kim, P.E., PTOE <br /> PROJECT MANAGER <br /> .ii5-I , c * <br /> ' 11 REPRESENTATIVE PROJECTS: <br /> I _ MIAMI-DADE COUNTY EQUITABLE DISTRIBUTION PROGRAM, MIAMI-DADE <br /> COUNTY,MIAMI,FL <br /> Project Manager: From 2007 through 2012, McMahon was engaged with the <br /> Equitable Distribution Program with Miami-Dade County. This contract was a <br /> task-based contract and McMahon had been issued three (3) task orders. One <br /> project was data collection, and another was a reversible lane study assignment <br /> JOHN KIM has worked in the traffic along West Flamm er Street. A major task assignment was the Commodore <br /> engineering and transportation planning Bicycle and Multi-use Trail. Responsibilities included project management, <br /> field since 1996. He left Miami-Dade design and construction plans for Bicycle Route No. I. A significant feature of <br /> County's Traffic Division in 2002 to the project was the design and permitting of a bridge over the Coral Gables <br /> pursue a career in consulting. His Waterway. <br /> I experience with Miami-Dade County <br /> included managing all aspects of the PROFESSIONAL TRAFFIC ENGINEERING SERVICES, 1•%LL4GE OF PINECRES', <br /> Traffic Concurrency Section and consisted PINECREST. FL <br /> of the review of traffic impact studies, Project Manager: Since 2010, McMahon has been engaged by the Village of <br /> I Developments of Regional Impact (DRI), Pinecrest for Professional Transportation Engineering services, on a task order <br /> large and small scale future land use based assignment. Responsibilities have included one task order, which is still an <br /> amendment applications and land active project. The project is a traffic calming study, and conceptual plan for SW <br /> development project site plans. Mr. KimI <br /> was also responsible for the review of 60th Avenue. The work has included obtaining field data measurements, traffic <br /> data, and coordination with various committees. Miami-Dade County, and details <br /> roadway design and Temporary Traffic for preliminary traffic calming tools to be used along the corridor. <br /> Control plans. Mr. Kim's tenure with <br /> I McMahon Associates has provided him DISTRICTWIDE MISCELLANEOUS STUDIES AND RCI DATACOLLFCIIONS <br /> with a vast amount of experience managing CONSULTANT,FDOT DISTRICT SIX, MIAMI, FL <br /> small and large scale projects for private Senior Project Manager: As a sub-consultant to Marlin Engineering, Inc., <br /> 1 and public sector clients. Private sector <br /> services include, traffic impact studies, provided professional and technical services to update the five Roadway <br /> Characteristic Inventory Traffic Features (Features 311, 312, 313, 322 and 323) <br /> parking studies, long range future land use for 21.982 miles of SR-AIA in Miami-Dade County in accordance with FDOT <br /> traffic studies, queuing analysis, traffic Procedure No. 850-000-001-j. RCI Traffic Operations Data and the FDOT RCI <br /> I signal warrant analysis and traffic signal <br /> design. Mr. Kim also serves as the Traffic Features and Characteristics Handbook. Data was collected using a utility van <br /> equipped with a JAMAR Distance Measuring Instrument (DMI) with GPS <br /> 'Engineer for a number of municipalities Equipped Recording (RAC Plus III/GPS). Field data was collected and <br /> I and manages contracts for the FDOT, <br /> which includes various traffic operations compiled into spreadsheets using WinRAC Plus software. The product of this <br /> task work order included the field reports with the spreadsheet tables containing <br /> studies and crash analysis. the event description, mile point and GPS coordinates for the five Traffic <br /> Operation features and documentation of the data input and edit runs. <br /> I . <br /> PROFESSIONAL QUALIFICATIONS: DISTRICTWIDE TRAFFIC OPERATIONS& SAFETY CONTRACT, FDOT DISTRICT <br /> 'EDUCATION: Bachelor of Science in SLI, MIAMI.FL <br /> I Industrial and Systems Engineering, <br /> Florida International University, 1994 Project Manager: This project required Safety Studies, Qualitative <br /> Assessments, Signal Warrant Analysis; Intersection Analysis, Arterial Analysis. <br /> Left-turn Phase Warrant Analysis, Supplemental Tasks and Fatal Crash <br /> REGISTRATIONS: Professional Traffic Reviews. The work involved operational characteristics of intersections and/or <br /> I <br /> Operations Engineer,2006;Professional segments of arterials, conducting field reviews, collecting data, observations of <br /> Engineer, Florida.2004 the operation, assembling crash data, performing engineering analysis and <br /> associated benefit/cost analyses of various alternatives. The contract duration is <br /> 1 }EARS EXPERIENCE: 18 for 5 years. and a maximum fee of S1.5 million. <br /> YEARS WITH MCMAHON: 10 <br /> OFFICE LOCATION: (Vest Palm Beach <br /> I <br /> 1 AMCMAHON CITY OF SUNNY ISLES BEACH <br />